Contract - Performance Pipeline Technologies, Inc. - 2021-01-28AGREEMENT
#328 Ductile Iron Pipe Rehab — Phase 1
This Agreement (hereinafter referred to as "AGREEMENT") is made and entered into this
28t" day of January 2021, by and between the COSTA MESA SANITARY DISTRICT, hereinafter
referred to as "DISTRICT," and Performance Pipeline Technologies, Inc., hereinafter referred
to as "CONTRACTOR."
WITNESSETH
That for and in consideration of the promises and agreements hereinafter made and
exchanged, DISTRICT and CONTRACTOR mutually agree as follows:
SCOPE OF WORK AND CONTRACT SUM
Scope of Work. CONTRACTOR shall perform all the work and shall provide and furnish
all labor, materials, tools, expendable equipment, and utility and transportation services required
to construct the #328 Ductile Iron Pipe Rehabilitation Phase 1, dated December 23, 2020
(hereinafter referred to as "PROJECT"). This project has been registered with the Department of
Industrial Relations using form PWC-100 pursuant to Labor Code section 1773.3.
1. Labor and Materials. All of said work to be performed and materials to be
furnished shall be in strict accordance with the plans and specifications entitled #328 Ductile Iron
Pipe Rehabilitation Phase 1, and CONTRACTOR agrees to do everything required by this
AGREEMENT, the plans and specifications, and the CONTRACT DOCUMENTS.
All labor, materials, tools, equipment, and services shall be performed under the direction
and administration of, and subject to the approval of, DISTRICT or its authorized representatives.
2. Contract Sum. DISTRICT agrees to pay, and CONTRACTOR agrees to accept
in full payment for the work above agreed to be done, the sum of $119,650.00.
NOTICE TO PROCEED AND TIMING
3. Notice to Proceed. No work, services, material, or equipment shall be performed
or furnished under this AGREEMENT unless and until a "Notice to Proceed" has been given to
CONTRACTOR by DISTRICT and all bonds and certificates of insurance required pursuant
hereto have been furnished to and approved by DISTRICT.
4. Time of Completion. CONTRACTOR agrees to commence the work to be
performed under this AGREEMENT on the start of the construction date specified in the "Notice
to Proceed" and to diligently prosecute the work to completion by the completion date specified
in the Notice to Proceed, which the parties agree is forty-five (45) WORKING DAYS.
5. Time of the Essence. Time is of the essence of this AGREEMENT.
6. Liquidated Damages/Additional Actual Damages. It is agreed by the parties
hereto that, in case the total work called for hereunder in all parts and requirements is not finished
or completed within the number of working days as set forth herein, damage will be sustained by
the DISTRICT and that it is and will be impractical and extremely difficult to ascertain and
HGSD 2016 CIP A-1 Agreement
determine the actual damage which the DISTRICT will sustain in the event of and by reason of
such delay. It is therefore agreed the CONTRACTOR will pay to the DISTRICT the sum of one
thousand Dollars ($ 1,000.00) per working day for each and every day of delay in finishing the
work in excess of the number of days prescribed in Section 4, and the CONTRACTOR agrees to
pay said liquidated damages herein provided for and further agrees that the DISTRICT may
deduct the amount thereof from any monies due or that may become due the CONTRACTOR
hereunder. Liquidated damages shall be a measurement of the sum to compensate the public
for inconvenience from not having the work completed on time and the cost of DISTRICT staff to
monitor the job beyond the completion date. DISTRICT shall further be entitled to recover its
additional actual damages incurred which shall be supplemental to the liquidated damages.
Provided strict compliance with Section 21 below is effected, the CONTRACTOR will be
granted an extension of time and will not be assessed with liquidated damages for any portion of
the delay in completion of the work beyond the time named herein due to unforeseeable causes
beyond the control and without the fault or negligence of the CONTRACTOR, including, but not
restricted to, acts of God or of the public enemy, fire, floods, epidemics, quarantine restrictions,
strike, and unsuitable weather, or delays of subcontractors due to such causes.
JOB PROGRESS AND COOPERATION
7. Job Progress. CONTRACTOR agrees to maintain a realistic critical path analysis
throughout the project. CONTRACTOR agrees to meet with DISTRICT's PROJECT MANAGER
or designee on a weekly or other periodic basis, or as requested by DISTRICT to review job
progress. "PROJECT MANAGER" for purposes of this AGREEMENT shall be the District
Engineer or such designee as has been given the authority for this PROJECT in a written
designation. CONTRACTOR agrees to provide DISTRICT with critical path analysis
documentation whenever job progress is impacted so that the completion date may be affected
or whenever delays or other impacts may give rise to CONTRACTOR's claim for additional days
or additional damages. Delay and other claims of damages based on CONTRACTOR's planned
early completion are prohibited.
8. Cooperation. CONTRACTOR agrees to cooperate with DISTRICT's PROJECT
MANAGER or designee and to provide submittals and participate in meetings in a good faith effort
to complete the PROJECT. If disagreements arise, CONTRACTOR agrees to document the
disagreement in accordance with these AGREEMENT provisions and provide DISTRICT with
early notice of the same for later resolution but shall continue to cooperate and prosecute the
work to completion in a diligent manner. Nothing herein shall excuse CONTRACTOR's strict
compliance with Section 21 if additional time or money is sought.
The DISTRICT's staff will assist CONTRACTOR with access to and shutting down pump stations
as needed and directing CONTRACTOR to the best locations to discharge tanker trucks.
9. CONTRACTOR's Independent Investigation.
(a) No plea of ignorance of conditions that exist or that may hereafter exist, or of
conditions or difficulties that may be encountered in the execution of the work under this
AGREEMENT, as a result of failure to make the necessary independent examinations and
investigations and no plea of reliance on initial investigations or reports prepared by DISTRICT
for purposes of letting this AGREEMENT out to bid will be accepted as an excuse for any failure
or omission on the part of the CONTRACTOR to fulfill in every detail all requirements of said
HGSD 2016 CIP A-2 Agreement
AGREEMENT, specifications, and plans, nor will such reasons be accepted as a basis for any
claims whatsoever for extra compensation or for an extension of time except as provided in
Section 21 of this AGREEMENT.
(b) Except as specifically provided in the CONTRACT DOCUMENTS, information
provided for purposes of bidding do not represent "conditions indicated" as being in existence and
are provided for the convenience of the CONTRACTOR in making its own investigation.
LABOR, WAGE, AND HOURS LAWS
10. Public Work. Notice is provided pursuant to Labor Code Section 1781 that this is
a "public work" as defined in Chapter 1, Part 7, Division 2 of the Labor Code, to which Section
1771 applies. CONTRACTOR shall pay prevailing wages, unless exempt.
11. Contractor/Subcontractors Registered. Contractor and all subcontractors are
registered with the Department of Industrial Relations pursuant to Labor Code Section 1725.5
and paid its annual fee.
12. Prevailing Wage Rates. Pursuant to Labor Code Section 1773.2, copies of the
prevailing rate of per diem wages can be found at http://www.dir.ca.gov/OPRL/PWD/index.htm
and are on file at the DISTRICT, which shall be made available to any interested party upon
request. CONTRACTOR shall post a copy of the determination of the director of the prevailing
rate of per diem wages at each job site. Said per diem wages are deemed to include employer
payments for health and welfare, pension, vacation and travel time, and subsistence pay, all in
accordance with Section 1773.1 of the Labor Code.
13. Payroll Records/ Electronic Records.
(a) The provisions of Section 1776 of the Labor Code regarding the preparation,
maintenance, and filing of payroll records are applicable to this AGREEMENT. Each contractor
and subcontractor shall keep accurate payroll records showing the name, address, social security
number, work classification, straight time and overtime hours worked each day and week, and
the actual per diem wages paid to each journeyman, apprentice, worker, or other employee
employed by him or her in connection with the public work. Certified payroll records shall be on
forms provided by the Division of Labor Standards Enforcement or contain the same information.
THE CONTRACTOR'S AND SUBCONTRACTOR'S PAYROLL RECORDS SHALL BE
SUBMITTED TO DISTRICT ON A WEEKLY BASIS. THE CONTRACTOR SHALL BE
RESPONSIBLE FOR SUBMITTAL OF SUBCONTRACTOR'S PAYROLL RECORDS.
Additionally, CONTRACTOR or subcontractor has 10 days in which to comply subsequent to
receipt of a written notice requesting the records enumerated in Section 1776, subdivision (a), of
the Labor Code. In the event that CONTRACTOR or subcontractor fails to comply within the 10-
day period, he or she shall, as a penalty to DISTRICT, forfeit One Hundred Dollars ($100.00) for
each calendar day, or portion thereof, for each worker, until strict compliance is effectuated.
DISTRICT may deduct this penalty from any monies due or that may become due CONTRACTOR
under this AGREEMENT.
(b) Contractor shall submit electronic payment records to the Department of Industrial
Relations.
14. Penalty. CONTRACTOR and any subcontractor under CONTRACTOR shall, as
a penalty to DISTRICT, forfeit not more than Two Hundred Dollars ($200.00) for each calendar
HGSD 2016 CIP A-3 Agreement
day, or portion thereof, for each worker paid (either by CONTRACTOR or any subcontractor under
CONTRACTOR) less than the prevailing rate set forth herein on the work provided for in this
AGREEMENT. DISTRICT may deduct the penalty from any monies due or that may become due
CONTRACTOR under this AGREEMENT. The difference between the prevailing wage rates and
the amount paid to each worker for each calendar day, or portion thereof, for which each worker
was paid less than the prevailing wage rate shall also be paid to each worker by CONTRACTOR
or subcontractor, in accordance with Section 1775 of the Labor Code of the State of California.
15. Apprentices. If applicable, the provisions of Labor Code Section 1777.5 requiring
the use of apprentices in certain ratios to journeymen on the PROJECT are hereby imposed upon
CONTRACTOR.
16. Legal Day's Work. In the performance of this AGREEMENT, not more than eight
(8) hours shall constitute a day's work, and the CONTRACTOR shall not require more than eight
(8) hours of labor in a day from any person employed by him hereunder except as provided in
Labor Code Section 1815. CONTRACTOR shall conform to Article 3, Chapter 1, Part 7 (Sections
1810 et seg.), of the Labor Code of the State of California, and it is agreed that the CONTRACTOR
shall forfeit to the DISTRICT as a penalty the sum of Twenty -Five Dollars ($25.00) for each worker
employed in the execution of this AGREEMENT by the CONTRACTOR or any subcontractor for
each calendar day during which any worker is required or permitted to labor more than eight (8)
hours in any one (1) calendar day and forty (40) hours in any one (1) week in violation of said
article. DISTRICT may deduct this penalty from any sums owed pursuant to this AGREEMENT.
PROGRESS PAYMENTS AND RETENTION
18. Progress Payments. Pursuant to Public Contract Code Section 7201, prior to the
fifteenth (15th) day of the month next following the commencement of the work, there shall be
paid to CONTRACTOR a sum equal to ninety-five percent (95%) of the value of the work
completed since the commencement of the work as determined by DISTRICT and thereafter prior
to the fifteenth (15th) day of each successive month as the work progresses. CONTRACTOR
shall be paid such sum as will bring the payments up each month to ninety-five percent (95%) of
the value of the work completed since the commencement of the work as determined by
DISTRICT, less all previous payments and authorized deductions, provided that CONTRACTOR
submits his request for payment prior to the last Wednesday of each preceding month. Pursuant
to Public Contract Code 7107, DISTRICT shall make the final payment, if unencumbered, or any
part thereof unencumbered, within sixty (60) days after the date of completion. Notwithstanding
the foregoing, CONTRACTOR shall provide DISTRICT with all documentation required by this
AGREEMENT, including the Final Closeout Agreement and Release of All Claims, as well as any
other documents required by the CONTRACT DOCUMENTS such as as-builts, red -line plans,
manufacturers and specific guarantees, and owner's manuals prior to receiving final payment.
Payments shall be made on demands drawn in the manner required by law, accompanied by a
certificate signed by the Project Manager, stating that the work for which payment is demanded
has been performed in accordance with the terms of the AGREEMENT, and that the amount
stated in the certificate is due under the terms of the AGREEMENT. Partial payments on the
AGREEMENT price shall not be considered as an acceptance of any part of the work. Nothing
herein shall limit DISTRICT's right to withhold one hundred fifty percent (150%) of disputed
amounts in the event of a good faith dispute.
19. Prompt Payments. DISTRICT agrees to promptly make progress payments on
undisputed and properly submitted payment requests within thirty (30) days and to comply with
HGSD 2016 CIP A-4 Agreement
the provisions of Public Contract Code Section 20104.50.
20. Retention Securities. Pursuant to California Public Contract Code Section
22300, CONTRACTOR will be entitled to post approved securities with the DISTRICT or an
approved financial institution in order to have the DISTRICT release funds retained by the
DISTRICT to insure performance of the AGREEMENT.
CHANGE ORDERS / EXTRA TIME / EXTRA WORK
21. Request for Extra Time or Additional Compensation. The following provisions
must be strictly complied with to obtain additional time to complete the job or to obtain additional
compensation:
(a) Request for Change Order — Additional Time. The CONTRACTOR shall promptly
notify the DISTRICT of any delay and shall, within ten (10) days from the beginning of any such
delay, notify the DISTRICT in writing of the cause of the delay, and the DISTRICT shall extend
the time for completing the work if in its judgment the cause so merits. The DISTRICT's
determination on this matter shall be final and conclusive on the parties hereto. CONTRACTOR
shall be required to submit a Request for Change Order, as set forth in this AGREEMENT, to the
DISTRICT'S PROJECT MANAGER within ten (10) days of the beginning of such a delay. No
adjustment shall be allowed for such delay unless there is strict compliance with this contractual
provision. CONTRACTOR's remedy shall be limited to the extra days granted and to any
damages that it may be entitled to using the formula agreed to by the parties for all damages as
provided in Section 22.
(b) Request for Change Order — Additional Compensation Sought.
(i) Should CONTRACTOR claim that the DISTRICT is demanding extra work
from it or consider any work demanded of it to be outside the requirements of this
AGREEMENT or if it considers any instruction, ruling, or decision of the PROJECT
MANAGER to be unfair, he shall within ten (10) days after any such demand is made, or
instruction, ruling, or decision is given, file a written protest with the PROJECT MANAGER
stating clearly and in detail his objections and the reasons therefor. Except for such
protests and objections as are made of record, in the manner and within the time above
stated, the CONTRACTOR shall be deemed to have waived, and does hereby waive, all
claims for extra work, damages, and extensions of time on account of demands,
instructions, rulings, and decisions of the District Engineer.
(ii) Should CONTRACTOR claim that additional compensation is due it
because of an unforeseen condition, CONTRACTOR shall bring that to DISTRICT's
attention promptly and within ten (10) days and shall submit a written request for change
order within ten (10) days to DISTRICT.
(c) Request for Change Order — DISTRICT Form to Be Used. DISTRICT's Request
for Change Order form, which is attached hereto as part of this AGREEMENT, shall be the form
that must be submitted in a timely fashion for a request for either additional time or additional
compensation. By initialing, the CONTRACTOR specifically agrees to use said form for those
purposes and understands that, if he does not submit that form in a timely manner, he waives the
right to request additional time or compensation. No oral modifications or other forms of
HGSD 2016 CIP A-5 Agreement
communication shall be accepted as compliance with this provision. The written request for
change order requirement cannot be waived.
Contractor's Initials /:�
(d) Change Order. Should DISTRICT agree that a change order is warranted for
either additional time or compensation, a written change order shall be executed. If DISTRICT
does not agree to the change order, and CONTRACTOR has provided timely notices and
submitted its written request for change order in a timely manner and on the proper form,
CONTRACTOR will have preserved the issue for later resolution in compliance with other
procedures set forth in this AGREEMENT or as the law may otherwise allow.
(e) Change Order Authority. The following authority is given to approve Change
Orders:
(f) Change Orders for Extra Time. The District Manager shall have the authority to
grant extra days without limit.
(g) Change Orders for Extra Compensation. The District Manager shall have the
authority to make change orders up to an aggregate amount of Ten Percent (10%) of the original
contract amount or Fifteen Thousand Dollars ($15,000), whichever is greater.
22. Damages / Extra Work Compensation. The parties have agreed to modify the
formula for damages set forth in the Standard Specifications for Public Works Construction. The
parties agree that the following damage formula shall be used to measure all of CONTRACTOR's
damages or extra work required by this PROJECT. CONTRACTOR shall be limited to the
following:
Direct costs
Mark-up
Labor 20%
Materials 15%
Equipment Rental 15%
Other Items 15%
Subcontracted work 10% (first $5,000)
Subcontracted work 5% (work in excess of first $5,000)
Specialty Subcontracting
(required by extra work) 5% (Provided at least three (3)
competitive bids are obtained
and CONTRACTOR selected
the lowest bidder)
Excluded from recovery shall be so-called "Eichleay damages," including, but not limited
to, home office overhead, insurance and bonding costs, lost bonding capacity, lost profits, and
lost interest.
CONTRACTOR acknowledges that his recovery for damages or extra work is limited as
provided in this Section.
Contractor's Initials _
HGSD 2016 CIP A-6 Agreement
SUBCONTRACTING
23. Subcontracting. CONTRACTOR acknowledges that he or she is aware of the
provisions of the "Subletting and Subcontracting Fair Practices Act" (Public Contract Code
Sections 4100 et sea.) and agrees to comply with all applicable provisions thereof. If any part of
the work to be done under this AGREEMENT is subcontracted, the subcontract shall be in writing
and shall provide that all work to be performed thereunder shall be performed in accordance with
this AGREEMENT. Upon request, certified copies of any or all subcontracts shall be furnished to
DISTRICT. The subcontracting of any or all of the work to be done will in no way relieve
CONTRACTOR of any part of his responsibility under the AGREEMENT. Pursuant to Public
Contract Code Section 4110, CONTRACTOR's violation of any of the provisions of the Subletting
and Subcontracting Fair Practices Act violates this AGREEMENT, and DISTRICT may cancel this
AGREEMENT or assess CONTRACTOR a penalty of not more than 10 percent (10%) of the
subcontract involved. DISTRICT may deduct this penalty from any monies due or that may
become due to CONTRACTOR for work performed under this AGREEMENT.
All persons engaged in the work, including subcontractors, will be considered as
employees of CONTRACTOR. CONTRACTOR will be held responsible for their work. DISTRICT
will deal directly with and make all payments to CONTRACTOR.
STOP NOTICES
24. Additional Costs. Pursuant to Civil Code Section 9358, upon receipt of a stop
notice, DISTRICT shall withhold from payment to CONTRACTOR sufficient funds due, or to
become due, to pay the claim stated in the stop notice and provide for DISTRICT's reasonable
costs of litigation. One hundred twenty-five percent (125%) of the amount of the claim stated in
the stop notice shall be a reasonable amount to withhold. In addition to the remedies authorized
by law, CONTRACTOR shall reimburse DISTRICT for administrative expenses incurred in
processing Notices to Withhold, Stop Notices, or similar legal documents arising out of a failure
of CONTRACTOR to pay for labor or materials. Said obligation shall be provided for in
CONTRACTOR's payment bond. DISTRICT shall have the right to deduct any such expenses
from amounts due or to become due to CONTRACTOR under this AGREEMENT.
COMPLETION
25. CONTRACTOR'S Waiver. CONTRACTOR agrees to execute a Final Close Out
Agreement and Release of All Claims on DISTRICT's form (attached). The execution by
CONTRACTOR of the Final Close Out Agreement and Release of All Claims shall constitute a
waiver of all claims against DISTRICT under or arising out of this AGREEMENT unless otherwise
stated in said document.
26. Guarantees. CONTRACTOR shall, and hereby does, guarantee all work for a
period of one (1) year after the date of acceptance of the work by the DISTRICT and shall repair
and replace any and all such work, together with any other work which may be displaced in so
doing, that may prove defective in workmanship and/or materials within the one (1) year period
from date of acceptance, without expense whatsoever to the DISTRICT, ordinary wear and tear
and usual abuse or neglect excepted. In the event of failure to comply with the aforementioned
conditions within five (5) days after being notified in writing, the DISTRICT is hereby authorized
to proceed to have the defects repaired and made good at the expense of the CONTRACTOR,
who shall pay the cost and charges therefor immediately on demand. This guarantee shall be in
HGSD 2016 CIP A-7 Agreement
addition to any manufacturer or specific guarantees that may be required. CONTRACTOR shall
provide those manufacturer and specific guarantees before CONTRACTOR may claim
entitlement to final payment.
INDEMNIFICATION
27. Indemnity. CONTRACTOR shall indemnify, defend with legal counsel approved
by DISTRICT, and hold harmless DISTRICT, and its officers, officials, employees, and volunteers,
from and against all liability, loss, damage, expense, and cost (including without limitation
reasonable legal counsel fees, expert fees, and all other costs and fees of litigation) of every
nature arising out of or in connection with CONTRACTOR's negligence, recklessness or willful
misconduct in the performance of work hereunder, or its failure to comply with any of its
obligations contained in this AGREEMENT, except such loss or damage which is caused by the
sole or active negligence or willful misconduct of the DISTRICT. Should conflict of interest
principles preclude a single legal counsel from representing both DISTRICT and CONTRACTOR,
or should DISTRICT otherwise find CONTRACTOR's legal counsel unacceptable, then
CONTRACTOR shall reimburse the DISTRICT its costs of defense, including without limitation
reasonable legal counsel fees, expert fees, and all other costs and fees of litigation. The
CONTRACTOR shall promptly pay any final judgment rendered against the DISTRICT and its
officers, officials, employees, and volunteers with respect to claims determined by a trier of fact
to have been the result of the CONTRACTOR's negligent, reckless or wrongful performance. It
is expressly understood and agreed that the foregoing provisions are intended to be as broad and
inclusive as is permitted by the law of the State of California and will survive termination of this
AGREEMENT.
CONTRACTOR's obligations under this Section apply regardless of whether or not such
claim, charge, damage, demand, action, proceeding, loss, stop notice, cost, expense, judgment,
civil fine or penalty, or liability was caused in part or contributed to by an Indemnitee. However,
without affecting the rights of DISTRICT under any provision of this AGREEMENT,
CONTRACTOR shall not be required to indemnify and hold harmless DISTRICT for liability
attributable to the active negligence of DISTRICT, provided such active negligence is determined
by agreement between the parties or by the findings of a court of competent jurisdiction. In
instances where DISTRICT is shown to have been actively negligent and where DISTRICT's
active negligence accounts for only a percentage of the liability involved, the obligation of
CONTRACTOR will be for that entire portion or percentage of liability not attributable to the active
negligence of DISTRICT.
Notwithstanding any limits provided for indemnification, CONTRACTOR's duty to defend
is broader. CONTRACTOR agrees to provide DISTRICT with a defense, with counsel reasonably
acceptable to DISTRICT, or pay DISTRICT's costs of defense upon service of any complaint,
petition or other pleading that requires DISTRICT to defend itself in any proceeding arising out of
the work described in this AGREEMENT. Said obligation shall not extend to disputes between
CONTRACTOR and DISTRICT.
INSURANCE
28. Insurance. Without limiting CONTRACTOR's indemnification of DISTRICT, and
prior to commencement of work, CONTRACTOR shall obtain, provide, and maintain at its own
expense during the term of this AGREEMENT policies of insurance of the types and amounts
described below and in a form satisfactory to DISTRICT.
HGSD 2016 CIP A-8 Agreement
General liability insurance. CONTRACTOR shall maintain commercial general liability
insurance with coverage at least as broad as Insurance Services Office Form CG 00 01, in an
amount not less than $1,000,000.00 per occurrence, $2,000,000.00 general aggregate, for bodily
injury, personal injury, and property damage, including, without limitation, blanket contractual
liability, and $2,000,000.00 completed operations aggregate.
Automobile liability insurance. CONTRACTOR shall maintain automobile insurance at
least as broad as Insurance Services Office Form CA 00 01 covering bodily injury and property
damage for all activities of the CONTRACTOR arising out of or in connection with work to be
performed under this AGREEMENT, including coverage for any owned, hired, non -owned, or
rented vehicles, in an amount not less than $1,000,000.00 combined single limit for each accident.
Umbrella or excess liability insurance. CONTRACTOR shall obtain and maintain an
umbrella or excess liability insurance policy with limits of not less than $4,000,000.00 that will
provide bodily injury, personal injury, and property damage liability coverage at least as broad as
the primary coverages set forth above, including commercial general liability and employer's
liability. Such policy or policies shall include the following terms and conditions:
• A drop down feature requiring the policy to respond in the event that any primary insurance
that would otherwise have applied proves to be uncollectable in whole or in part for any
reason;
• Pay on behalf of wording as opposed to reimbursement.
• Concurrency of effective dates with primary policies; and
• Policies shall "follow form" to the underlying primary policies.
• Insureds under primary policies shall also be insureds under the umbrella or excess
policies.
Workers' compensation insurance. CONTRACTOR shall maintain Workers'
Compensation Insurance (Statutory Limits) and Employer's Liability Insurance (with limits of at
least $1,000,000.00) for CONTRACTOR's employees in accordance with the laws of the State of
California, Section 3700 of the Labor Code. In addition, CONTRACTOR shall require each
subcontractor to similarly maintain Workers' Compensation Insurance and Employer's Liability
Insurance in accordance with the laws of the State of California, Section 3700 of the Labor Code,
for all of the subcontractor's employees.
CONTRACTOR shall submit to DISTRICT, along with the certificate of insurance, a
Waiver of Subrogation endorsement in favor of DISTRICT and its officers, agents, employees,
and volunteers.
Builder's risk insurance. Upon commencement of construction and with approval of
CITY, CONTRACTOR shall obtain and maintain builder's risk insurance as specified below.
The named insureds shall be CONTRACTOR, all subcontractors (excluding those solely
responsible for design work) of any tier, suppliers, and CITY and its officers, officials, employees,
and agents. CONTRACTOR shall not be required to maintain property insurance for any portion
of the PROJECT following transfer of control thereof to CITY.
Policy shall be provided for replacement value on an "all risk" basis. There shall be no
coinsurance penalty provision in any such policy. Policy must include: (1) coverage for any
HGSD 2016 CIP A-9 Agreement
ensuing loss from faulty workmanship, nonconforming work, or omission or deficiency in design
or specifications; (2) coverage against machinery accidents and operational testing; (3) coverage
for removal of debris and insuring the buildings, structures, machinery, equipment, materials,
facilities, fixtures, and all other properties constituting a part of the PROJECT; (4) transit coverage,
including ocean marine coverage (unless insured by the supplier), with sub -limits sufficient to
insure the full replacement value of any key equipment item; and (5) coverage with sub -limits
sufficient to insure the full replacement value of any property or equipment stored either on or off
the site. Such insurance shall be on a form acceptable to CITY to ensure adequacy of terms and
sub -limits.
Proof of insurance. CONTRACTOR shall provide certificates of insurance to DISTRICT
as evidence of the insurance coverage required herein, along with a waiver of subrogation
endorsement for workers' compensation. Insurance certificates and endorsement must be
approved by DISTRICT's risk manager prior to commencement of performance. Current
certification of insurance shall be kept on file with DISTRICT at all times during the term of this
AGREEMENT. DISTRICT reserves the right to require complete, certified copies of all required
insurance policies at any time.
Duration of coverage. CONTRACTOR shall procure and maintain for the duration of the
AGREEMENT insurance against claims for injuries to persons or damages to property, which may
arise from or in connection with the performance of the work hereunder by CONTRACTOR or his
agents, representatives, employees, or subcontractors. CONTRACTOR must maintain general
liability and umbrella or excess liability insurance for as long as there is a statutory exposure to
completed operations claims. DISTRICT and its officers, officials, employees, and agents shall
continue as additional insureds under such policies.
DISTRICT's rights of enforcement. In the event any policy of insurance required under
this AGREEMENT does not comply with these requirements or is canceled and not replaced,
DISTRICT has the right but not the duty to obtain the insurance it deems necessary, and any
premium paid by DISTRICT will be promptly reimbursed by CONTRACTOR or DISTRICT will
withhold amounts sufficient to pay premium from CONTRACTOR payments. In the alternative,
DISTRICT may cancel this AGREEMENT.
Acceptable insurers. All insurance policies shall be issued by an insurance company
currently authorized by the Insurance Commissioner to transact business of insurance in the State
of California, with an assigned policyholders' Rating of A- (or higher) and Financial Size Category
Class VII (or larger) in accordance with the latest edition of Best's Key Rating Guide, unless
otherwise approved by the DISTRICT's Counsel.
Waiver of subrogation. All insurance coverage maintained or procured pursuant to this
AGREEMENT shall be endorsed to waive subrogation against DISTRICT and its elected or
appointed officers, agents, officials, employees, and volunteers or shall specifically allow
CONTRACTOR or others providing insurance evidence in compliance with these specifications
to waive their right of recovery prior to a loss. CONTRACTOR hereby waives its own right of
recovery against DISTRICT and shall require similar written express waivers and insurance
clauses from each of its subconsultants.
Enforcement of AGREEMENT provisions (non estoppel). CONTRACTOR
acknowledges and agrees that any actual or alleged failure on the part of the DISTRICT to inform
CONTRACTOR of non-compliance with any requirement imposes no additional obligations on the
HGSD 2016 CIP A-10 Agreement
DISTRICT, nor does it waive any rights hereunder.
Requirements not limiting. Requirements of specific coverage features, or limits
contained in this Section are not intended as a limitation on coverage, limits or other requirements,
or a waiver of any coverage normally provided by any insurance. Specific reference to a given
coverage feature is for purposes of clarification only as it pertains to a given issue and is not
intended by any party or insured to be all inclusive, or to the exclusion of other coverage, or a
waiver of any type.
Notice of cancellation. CONTRACTOR agrees to oblige its insurance agent or broker
and insurers to provide DISTRICT with a thirty (30) day notice of cancellation (except for
nonpayment for which a ten (10) day notice is required) or nonrenewal of coverage for each
required coverage.
Additional insured status. General liability policies shall provide or be endorsed to
provide that DISTRICT and its officers, officials, employees, and agents shall be additional
insureds under such policies. This provision shall also apply to any excess liability policies.
DISTRICT's right to revise requirements. The DISTRICT reserves the right, at any time
during the term of the AGREEMENT, to change the amounts and types of insurance required by
giving the CONTRACTOR a ninety (90)-day advance written notice of such change. If such
change results in substantial additional cost to the CONTRACTOR, the DISTRICT and
CONTRACTOR may renegotiate CONTRACTOR's compensation.
Self -insured retentions. Any self -insured retentions must be declared to and approved
by DISTRICT. DISTRICT reserves the right to require that self -insured retentions be eliminated,
lowered or replaced by a deductible. Self-insurance will not be considered to comply with these
specifications unless approved by DISTRICT.
Timely notice of claims. CONTRACTOR shall give DISTRICT prompt and timely notice
of claims made or suits instituted that arise out of or result from CONTRACTOR's performance
under this AGREEMENT, and that involve or may involve coverage under any of the required
liability policies.
Additional insurance. CONTRACTOR shall also procure and maintain, at its own cost
and expense, any additional kinds of insurance which in his/her/its own judgment may be
necessary for its proper protection and prosecution of the work.
29. Workers' Compensation.
A. CONTRACTOR shall carry Workers' Compensation Insurance, and require all
subcontractors to carry Workers' Compensation Insurance, as required by the Labor Code of the
State of California. CONTRACTOR, by executing this AGREEMENT, hereby certifies:
"I am aware of the provisions of Section 3700 of the Labor Code which
require every employer to be insured against liability for Workers'
Compensation or to undertake self-insurance in accordance with the
provisions of that code, and I will comply with such provisions before
commencing the performance of the work of this AGREEMENT."
B. CONTRACTOR acknowledges that it is unlawful and a crime to intentionally make
HGSD 2016 CIP A-11 Agreement
false statements about employees that misclassify their job duties to obtain lesser premium costs
or for other improper purposes. CONTRACTOR agrees that if it makes false statements about
its employees for the purpose of obtaining lower workers' compensation premiums or for other
unlawful purposes, it shall be considered a material breach of this AGREEMENT.
30. Bonds. Within the time period set forth in the CONTRACT DOCUMENTS and
prior to commencing the work on the PROJECT, the CONTRACTOR shall file with the DISTRICT
a good and sufficient labor and material payment bond (Payment Bond) and a performance bond
(Performance Bond) in the amount of one hundred percent (100%) of the Contract Sum covering
performance of the work other than the professional design services portion of the work. The
Performance Bond and Payment Bond shall be in the form required by the CONTRACT
DOCUMENTS. The amounts of the Payment Bond and Performance Bond shall be increased
as, when, and in the amount of any Change Orders that are executed increasing the Contract
Sum, the CONTRACTOR shall, upon request by the DISTRICT, provide evidence of such
increases. Should the Payment Bond or Performance Bond or any Surety on such bond become
or be determined by the DISTRICT to be insufficient, it shall be replaced within ten (10) days by
a bond that fully complies with the requirements of this Section. No further payments to the
CONTRACTOR for the work performed shall be made or due until the CONTRACTOR has fully
complied with the requirements of this Section.
Duration. The Payment Bond shall remain in effect until acceptance of the work by the
DISTRICT and payment of all stop notices and claims by the CONTRACTOR or the
subcontractors, of any tier, have been satisfied. The Performance Bond shall remain in effect
and assure faithful performance of all the CONTRACTOR's obligations under the CONTRACT
DOCUMENTS, including, without limitation, all obligations that survive final completion or
termination, such as, but not limited to, CONTRACTOR's warranty, commissioning, and indemnity
obligations.
Surety. At the time the AGREEMENT is signed, and at all times thereafter until final
payment has been made by the DISTRICT, the Surety on the Payment Bond shall be an Admitted
Surety, and the Surety on the Performance Bond shall be a licensed Surety in good standing with
the California Department of Insurance and have an A.M. Best's Insurance Rating of not less than
A-: VI.
Premiums. The premiums for all bonds are included in the Contract Sum and shall be
paid by the CONTRACTOR.
Obligee. The Payment Bond and Performance Bond shall each name the DISTRICT as
obligee. All bonds purchased by the subcontractors shall name the CONTRACTOR and the
DISTRICT as dual obligees.
No exoneration. Changes, Change Orders, Unilateral Change Orders, Field Orders,
modifications, and adjustments to the Contract Sum or completion date shall in no way release
or exonerate the CONTRACTOR or its Surety from their obligations, and notice thereof shall be
waived by the Surety. The foregoing provision shall be included in the terms of the Payment
Bond, Performance Bond, and any bonds obtained by the subcontractors.
Communications. The DISTRICT shall have the right to
CONTRACTOR's Sureties with respect to matters that are related
performance of its obligations under the CONTRACT DOCUMENTS.
communicate with the
to the CONTRACTOR's
CONTRACTOR shall be
HGSD 2016 CIP A-12 Agreement
provided with a copy of all such written communications. Such communications shall not create,
or be interpreted as creating, any contractual relationship between the DISTRICT and the Surety.
No limitation. The requirements of this Section pertaining to the Performance Bond and
the Payment Bond shall be without limitation to any other obligations the CONTRACTOR may
have under applicable law to provide bonding for the benefit of and to assure payment to the
subcontractors or subconsultants performing the work for the PROJECT.
TERMINATION
31. Termination.
A. If CONTRACTOR should fail to comply with any of the provisions hereof, in the
event CONTRACTOR should become the subject of a proceeding under state or federal law for
relief of debtors, or if CONTRACTOR makes an assignment for the benefit of creditors, DISTRICT
shall have the right to hold CONTRACTOR in default and cancel this AGREEMENT in whole or
in part.
B. Should CONTRACTOR, at any time during the progress of the work, refuse or
neglect to supply sufficient material or labor, or fail in compliance with any provision of this
AGREEMENT, DISTRICT shall have the right, without prejudice to any other right or remedy it
may have, to provide such materials and labor, or make good such deficiencies as DISTRICT
may deem expedient after three (3) day notice in writing, delivered or mailed to CONTRACTOR
at his last address on file with DISTRICT, and CONTRACTOR shall be liable for the cost and
expense thereof which may be deducted by DISTRICT from any money due or that may become
due CONTRACTOR.
C. Without limiting any rights which DISTRICT may have by reason of any default by
CONTRACTOR hereunder, DISTRICT reserves the right to terminate this AGREEMENT in whole
or in part at its convenience. In such event DISTRICT shall compensate CONTRACTOR, subject
to deduction for previous payments and authorized deductions, by: (i) reimbursing
CONTRACTOR for all actual expenditures and costs incurred in performing under this
AGREEMENT, (ii) reimbursing CONTRACTOR for all expenditures made and costs incurred with
DISTRICT's prior written approval in settling or discharging outstanding commitments entered
into by CONTRACTOR in performing under this AGREEMENT, and (iii) paying CONTRACTOR
as a profit, insofar as a profit is realized hereunder, an amount equal to the profit on the entire
AGREEMENT estimated at the time of termination, multiplied by the percentage of completion of
the work. In no event, however, will the compensation to CONTRACTOR exceed the total
AGREEMENT price less payments previously made and less the AGREEMENT price of work not
terminated. Upon receipt of any notice of termination, CONTRACTOR shall, unless the notice
otherwise directs, (i) immediately discontinue the work and the placing of all orders and
subcontracts in connection with this AGREEMENT, (ii) immediately cancel all existing orders and
subcontracts made hereunder, and (iii) immediately transfer to DISTRICT all materials, supplies,
work -in -process, appliances, facilities, equipment, machinery, and tools acquired by
CONTRACTOR in connection with the performance of this AGREEMENT.
CLAIM RESOLUTION
32. Resolution of Claims. For all claims that are Three Hundred Seventy -Five
Thousand Dollars ($375,000.00) or less, the provisions of Public Contracts Code Sections 20104
HGSD 2016 CIP A-13 Agreement
et seg. (Article 1.5 - Resolution of Construction Claims) shall be followed. For claims for money
or time submitted pursuant to Public Contract Code 9204, the provisions of that section shall apply
and a meet and confer process, followed by nonbinding mediation, shall occur.
33. Notice to Contractor of Claims. DISTRICT shall provide notice to
CONTRACTOR upon receipt of any third -party claim related to the AGREEMENT.
CONTRACT DOCUMENTS AND INTERPRETATION
34. (a) Other Documents Included. It is further agreed by the parties hereto that the
following documents are incorporated herein by reference and are to be read and construed
together as the full, complete, and integrated terms of this AGREEMENT and, collectively with
this AGREEMENT, may be referred to as the CONTRACT DOCUMENTS:
A. Notice Inviting Bids & Scope of Work.
B. Proposal
C. Scope of Work
D. District Request for Change Order/Change Order
E. Notice to Proceed
F. Labor and Materials Bond
G. Performance Bond
H. Final Closeout Agreement
I. Plan Drawings (#328 Ductile Iron Pipe Rehab — phase 1)
J. General Conditions
K. Special Conditions
L. General Requirements
(b) Interpretation of Incorporated Documents. In the event of any conflict,
inconsistency or incongruity between the provisions of this AGREEMENT and the
provisions of any document listed in Subsection (a) above, the provisions of this
AGREEMENT shall prevail unless a contrary intent is shown. This AGREEMENT
shall be interpreted as though it had been drafted by the DISTRICT and the
CONTRACTOR equally. This AGREEMENT shall be interpreted according to the
laws of the State of California.
35. Integration/No Oral Modifications. This AGREEMENT integrates all
understandings of the parties. Any amendment to this AGREEMENT must be made in writing
and signed by the parties with legal authority to execute the same. CONTRACTOR is aware that
DISTRICT is a special district and that, pursuant to Health and Safety Code Section 6487, contract
amendments may only be entered into by compliance with those formalities. Notwithstanding the
above, requests for additional time or compensation may be made by following the procedures
provided for in this AGREEMENT.
36. Effect of Invalidity. The invalidity in whole or in part of any provisions hereof shall
not affect the validity of any other provision.
MISCELLANEOUS
HGSD 2016 CIP A-14 Agreement
37. Discrimination, Minorities, Aliens. The CONTRACTOR shall not discriminate
nor allow its employees, agents, principals, or subcontractors to discriminate against any
employee or applicant for employment on the basis of race, religious creed, national origin, or
sex. CONTRACTOR shall take affirmative steps to hire qualified minority individuals when job
opportunities occur and utilize local business firms when possible and when consistent with
California Constitution Article 1, Section 31 (a) [Proposition 209].
38. Equal Employment Opportunity. CONTRACTOR shall comply with all
provisions of Executive Order 11246, entitled "Equal Employment Opportunity" and amended by
Executive Order 11375, and as supplemented in Department of Labor Regulations (41 CFR part
60).
39. Drug -Free Work. CONTRACTOR agrees to provide a drug -free workplace in
accordance with 24 CFR part 24, sub -part F. Under 24 CFR part 24, sub -part F, the
CONTRACTOR will provide certification in writing that it will provide a drug -free workplace by:
(a) Publicizing a statement notifying employees that the unlawful manufacture,
distribution, dispensing, possession, or use of a controlled substance is prohibited
in the workplace and specifying the action it will take against employees for
violation of such prohibition.
(b) Establishing an ongoing drug -free awareness program to inform employees about:
1. Degrees of drug abuse in the workplace.
2. The policy of maintaining a drug -free workplace.
3. Any available drug counseling, rehabilitation, and employee assistance
programs; and
4. The penalties which may be imposed on employees for drug abuse violations
occurring in the workplace.
(c) Making it a requirement that every employee to be engaged in the performance of
the AGREEMENT be given a copy of the statement required by Subsection (a);
(d) Notifying employees in the statement required by Subsection (a) that as a condition
of employment under the AGREEMENT the employee will:
1. Abide by the term of the statement; and
2. Notify the employer in writing of any conviction for a violation of a criminal drug
statute occurring in the workplace no later than five (5) calendar days after
such conviction.
(e) Notifying DISTRICT in writing within ten (10) calendar days after receiving notice
under Subsection (d)(2) from an employee or otherwise receiving actual notice of
such conviction. Employer of said convicted employee must provide notice,
including conviction title, to the DISTRICT;
(f) Taking one of the following actions, within thirty (30) calendar days of receiving
notice under Subsection (d)(2), with respect to any employee who is so convicted:
1. Taking appropriate action against such an employee, up to and including
termination, consistent with the requirements of the Rehabilitation Act of 1973,
as amended; or
2. Requiring such employee to participate satisfactorily in a drug abuse
HGSD 2016 CIP A-15 Agreement
assistance or rehabilitation program approved for such purposes by a federal,
state, or local health, law enforcement, or other appropriate agency.
(g) Making a good faith effort to continue to maintain a drug -free workplace through
implementation of Sections (a), (b), (c), (d), (e), and (f).
40. Permits. The CONTRACTOR shall obtain from the DISTRICT, County, City,
State, or other responsible public agencies all licenses and permits, and pay all fees related
thereto, necessary to complete the job.
41. Assignment. No assignment by the CONTRACTOR of this AGREEMENT or any
part hereof, or of funds to be received hereunder, will be recognized by the DISTRICT unless
such assignment has had prior written approval and consent of the DISTRICT and the Surety.
42. Safety and Site Condition. CONTRACTOR shall perform all operations with due
regard for safety and in strict compliance with all applicable laws relating thereto. It shall be
CONTRACTOR's responsibility to keep the site in a clean, neat, and orderly condition. It shall
also be CONTRACTOR's duty to dust -palliate all working areas and access routes, if applicable.
All operations shall be conducted by CONTRACTOR so that no fire hazards are created.
43. Utility Location. DISTRICT acknowledges its responsibilities with respect to
locating facilities pursuant to California Government Code Section 4215.
44. Trenching. If this AGREEMENT involves digging trenches or other excavations
that extend deeper than four (4) feet below the surface, CONTRACTOR shall promptly, and
before the following conditions are disturbed, notify the DISTRICT in writing, of any:
(a) Material that the CONTRACTOR believes may be material that is hazardous
waste, as defined in Section 25117 of the Health and Safety Code, that is required
to be removed to a Class I, Class II or Class III disposal site in accordance with
provisions of existing law.
(b) Subsurface or latent physical conditions at the site differing from those indicated.
(c) Unknown physical conditions at the site of any unusual nature, different materially
from those ordinarily encountered and generally recognized as inherent in work of
the character provided for in the AGREEMENT.
The DISTRICT shall promptly investigate the conditions, and if it finds that the conditions
do materially so differ, or do involve hazardous waste, and cause a decrease or increase in the
CONTRACTOR's cost of, or the time required for, performance of any part of the work shall issue
a change order in accordance with the procedures described in this AGREEMENT.
In the event that a dispute arises between the DISTRICT and the CONTRACTOR as to
whether the conditions materially differ, or involve hazardous waste, or cause a decrease or
increase in the CONTRACTOR's cost of, or time required for, performance of any part of the work,
the CONTRACTOR shall not be excused from any scheduled completion date provided for by the
AGREEMENT but shall proceed with all work to be performed under the AGREEMENT. The
CONTRACTOR shall retain any and all rights provided either by this AGREEMENT or by law
HGSD 2016 CIP A-16 Agreement
which pertain to the resolution of disputes and protests between the contracting parties provided
that CONTRACTOR complies with Section 21 when asserting such claim.
45. Notices. The parties hereto agree that all formal notices required by this
AGREEMENT may be provided to the following persons at the following addresses by sending
the same by certified or registered mail as follows:
DISTRICT: Costa Mesa Sanitary District
11
Costa Mesa, CA 9 d
CONTRACTOR: Performance Pipeline Technologies, Inc.
5292 System Dr.
Huntington Beach, CA 92649
46. Gratuities. CONTRACTOR warrants that neither it nor any of its employees,
agents, or representatives has offered or given any gratuities to DISTRICT's employees, agents,
or representatives with a view toward securing this AGREEMENT or securing favorable treatment
with respect thereto.
47. Conflict of Interest. CONTRACTOR warrants that he has no blood or marriage
relationship with, and that it is not in any way associated with, any architect, engineer or other
preparer of the plans and specifications for this PROJECT.
48. Copeland "Anti -Kickback" Act. If applicable to this AGREEMENT,
CONTRACTOR and its subcontractors shall comply with the provisions of the Copeland "Anti -
Kickback" Act (18 U.S.C. Section 874), as supplemented in Department of Labor regulations,
which Act provides that each contractor shall be prohibited from including, by any means, any
person employed in the construction, completion, or repair of any public work to give up any part
of the compensation to which he is otherwise entitled.
49. Attorney's Fees. In any action or proceeding brought by either party against the
other party arising out of or in any way connected to this AGREEMENT, or where any provision
hereof is validly asserted as a defense, the parties shall bear their own attorney's fees, costs, and
expenses. Nothing in this provision shall excuse CONTRACTOR's duty to provide DISTRICT
with a defense at CONTRACTOR's cost when DISTRICT receives a complaint, petition, or other
pleading from a third -party requiring DISTRICT to defend itself. Notwithstanding the foregoing,
costs and attorney's fees shall be available pursuant to Code of Civil Procedure Section 386.6 in
connection with an interpleader.
50. Assignment of Rights. Pursuant to Section 7103.5 of the Public Contract Code,
in entering into a public works contract or a subcontract to supply goods, services or materials
pursuant to a public works contract, the CONTRACTOR or subcontractor offers and agrees to
assign to the awarding body all rights, title, and interest in and to all causes of action it may have
under Section 4 of the Clayton Act (15 U.S.C. Sec. 15) or under the Cartwright Act (Chapter 2
(commencing with Section 16700) of Part 2 of Division 7 of the Business and Professions Code),
arising from purchases of goods, services, or materials pursuant to the public works contract or
the subcontract. This assignment shall be made and become effective at the time the awarding
body tenders final payment to the CONTRACTOR, without further acknowledgment by the parties.
HGSD 2016 CIP A-17 Agreement
51. SCAQMD and GARB Compliance. CONTRACTOR agrees to comply with all
South Coast Air Quality Management District (SCAQMD) and California Air Resources Board
(CARB) requirements, including, but not limited to, compliance with CARS Regulations limiting
idling of self-propelled diesel -fueled on -road and off -road vehicles and equipment (25 HP and up)
to no more than five (5) consecutive minutes as specified in Title 13 of the California Code of
Regulations, section 2449 (dX3), Idling.
52. Mined Construction Materials. CONTRACTOR shall not purchase mined
construction material, except from a mining operation that is currently Identified in the list published
pursuant to subdivision (b) of Section 2717 of the Public Resources Code. Refer to the current
3098 list for qualified mining operations at www.consrv.ca.gov/OMR/ab-3098—listicurrent fist.
IN WITNESS WHEREOF, the parties hereto have entered into this AGREEMENT the date
and year first above written.
COSTA MESA SANITARY DISTRICT:
Approved By:
General Manager
2�E�
Approved' as to Form:
f
Harper & Burris LLP
District Counsel
Performance Pipeline Technologies, Inc..
Reviewed and Accepted by. -
Signature
(„cat Co 4�.ssbvr„�c,✓'
Name
Tide
HGSD 2016 CIP A-1S Agreement
CALIFORNIA ACKNOWLEDGMENT CIVIL CODE § 1189
r;ror.::E+.uirr�t.Y. .7't':•s'S:b t�4..K`r :>i +>`C: , '%L:Y;: Y. .. , i
..:.�a.a:'"x:i•!i.�:�v_.r.,.:s<.�='iti.��:yC:nf.."z..rv�F7v_.f:isx. rr....l _fh_1i�;::x�:ix:.�:Y'� x:: :,\,., ..:r,,.7�r;.�Y....
A notary public or other officer completing this certificate verities only the identity of the individual who sinned tier^ docurnent
to which this certificate is attached, and not: the trUffifr.riness, accuracy, or validity of that docurnent.
State of California
County of
On before me, C k i-�e 5.._.._1�� � �
.........
Date Ilere lit sett NCtr))F:? ol)C:) Titl ' o/' tl)(? OfffC't',i_
personally appeared R
Nolne(s) of .Signer(s)
who proved to me on the basis of satisfactory evidence to be the person(s) \nrl•aosc� n�+rrae(s) is/are subscribed
to the within instrument and acknowledged to me that he/she/they executed t.he� sanaE� in his/her:ttheir
authorized capacity(ies), and that by his/Fier/their signcItr.rre(s) on the instrument thc� person(s). or tlae Entity
Upon behalf of which the person(s) acted, exect_rted the inst:run•ient.
CHARLES MARC NUWER
Z �-~
Notary Public - California r
Orange County
77717� My
Commission # 2246268
Comm. Expires Jun 16, 2022
Pkice Notary Seal 017ct/or Stamp At)ove
I certify Under PENALTY OF PERJURY under the
laws of the State of Califoi nia th<'rt tl•aea foregoing
l..)�.aragraph is true and correca..
WITNESS my hand card official i-;etal.
Ull' I IONAL
Signolule, of Notclry Public
Completing this intoi•i•natioi-r con deter alteration of the doc.oment car
froudulent reattochment of this fora? to on unintended doccrr)<<7nt.
Description of Attached Document
Title or type of Docr.rment: c... '.... >�... ............... _.. i'}
DocumentDate: .......... _...._._....____..... ..._..._, ... ........ _..._._......... of Pages: .......... . ................ .......
Signer(s) Other Than Named Above:
Capacity(ies) Claimed by Signer(s)
Signer's Name: .
ED Corporate Officer-- Title(s):
ED Partner --- f.-i Limited I-) General
❑ Individual 0 Attorney in Fact
El Trustee c1 Guardian or Conservator
Other:
Signer is Representing:
cis1.",i.'1.src c:n`C'.. A-:Tit.•Sri,:o::.�R:t�!'r4.:r":::x::ucv✓.:>a.::>:n ., :.:.:. .r.r-•.•, •,.,�...-....,.,..... ._.......
2018 National Notary Association
Signer's Nan-)e:
1'.1 Corporate Officer.. '--' Title(s): _._._.
l...a Partner -..1-1 Lrrnited r:.] (:"enerril
[.-1 Individual C-i Atto ney in 1==r�ct
t.1 Trur tc)e (
.._? lJr.iCrrr.lrara or Conservator
E.7 Other*
Signer is Representing:
M 1304-09 (09/ 19)