Bid Proposal - Avala Engineering, Inc. - 2020-12-1COSTA MESA SANITARY DISTRICT
ORANGE COUNTY, CALIFORNIA
BID PROPOSAL FORM
BRICK SEWER MANHOLE REHABILITATION (PHASE 2)
Name of Bidder:
Address: 4P
Phone No. :
TO THE BOARD OF DIRECTORS
COSTA MESA SANITARY DISTRICT:
Projewl No. 324
&a
Pursuant to and in compliance with the Notice Inviting Bids (Bids) and the other documents relating
thereto, the undersigned bidder has carefully examined and is completely familiar with the plans,
specifications, and contract documents including the local conditions affecting the performance of the
contract, the character, quality, quantities, and scope of the work, and the materials to be furnished as to the
requirements of the specifications and the contract.
If awarded the contract, the undersigned bidder hereby proposes and agrees to perform within the time
stipulated in the contract, including all of its component parts and everything required to be performed, and
to furnish any and all of the labor, material, tools, equipment, transportation, services, permits, utilities, and
all other items necessary to perform the contract and complete in a workmanlike manner, all of the work
required in connection with the construction of said work all in strict conformity with the plans and
specifications and other contract documents, including addenda Nos.:_L, and _, on file in the
District office for the prices hereinafter set forth.
The undersigned as bidder, declares that the only persons or parties interested in this proposal as principals
are those named herein; that this proposal is made without collusion with any person, firm, or corporation;
and he proposes and agrees, if the proposal is accepted, that lie will execute a contract with the District in
the form set forth in the contract documents and that he will accept in full payment thereof the following
prices, to wit:
SAN11r4',,,. PROJECT NO. 324
lrs
BID FORM
rr
BRICK SEWER MANHOLE REHABILITATION (PHASE 2)
BID
ITEM
APPROX.
DESCRIPTION
UNIT
UNIT
TOTAL
.qUANTITY
AMOUNT
Bonds, Insurance, and Permits: Work under this item
I
Lump Sum
includes any costs incurred for securing bonds, insurance
Lump
$ /000
permits and financing for construction work.
Sum
Mobilization, Demobilization and Cleanup: Work under
this item shall include preparatory and cleanup operations
including, but not limited to, those necessary for the
movement of personnel, equipment, materials, and
incidentals to and from the project site, securing a
temporary construction yard, installation of temporary chain
link fencing, securing all necessary permits from CMSD
2
Lump Sum
and City of Costa Mesa, securing the work site during all
Lump
$
work activities, and maintaining the project site in a safe
Sum
and orderly manner during construction.
Amount bid for mobilization / demobilization shall not
exceed 4.0% of contractors bid total.
District shall pay 50% of this item for mobilization
activities, and 50% for demobilization activities upon
project completion.
CMSD Project No. 324, Phase 2 Bid Form -- 2 of 6
PROJECT NO. 324
BID FORM
BRICK SEWER MANHOLE REHABILITATION (PHASE 2)
BID
ITEM
APPROX
DESCRIPTION
UNIT
TOTAL
_QUANTITY
PRICE
AMOUNT
3-14
Varies Per
All manholes to be rehabilitated are brick manholes.
Manhole
See Below
Work for Items Nos. 3 through 14 of the Bid Form
includes, but is not linnited to, the following: manhole
cleaning, hand sawing protruding roots, surface
preparation, installation of a one-piece structural liner
on manhole walls and bench (not in channel), access,
traffic control, confined space entry, bypass sewer flow
if required, and any other necessary incidental items,
equipment, or manpower for a turnkey installation.
Traffic control shall include engineered traffic control
plans to be approved by the city of Costa Mesa
providing the required traffic control including, but not
Varies
0 Number
limited to, changeable message boards, signs,
Per Bid
Here
delineators, traffic cones, barricades, flashing arrow
Item
signs, and all other work necessary to comply with
Work Area Protection and Traffic Control Handbook
(WATCH manual), recent edition, other traffic control
publications, and the city of Costa Mesa. Traffic
control for work shall conform to the provisions on the
City of Costa Mesa encroachment permit.
District reserves the right to remove any item or items
from the final project after contract is awarded but
before construction begins. There will be no
compensation paid for removed items.
GIS MH4 103570
Lump Sum
Address: 1900 Fullerton Avenue
3
4'- 1 " Deep
Location: Fullerton Avenue 100' northeast of the center
Lump
line of East 19"' Street.
Sewer Out: 8-inch (Northeast)
Sum
Work under this item shall include furnishing all labor,
material, and work necessary for rehabilitating the manhole.
CMSD Project No. 324, Phase 2 Bid Form — 3 of 6
PROJECT NO. 324
BID FORM
BRICK SEWER MANHOLE REHABILITATION (PHASE 2)
BID
ITEM
EM
APPROX.
DE SCRIPTION
UNIT
TOTAL
-QUANTITY
PRICE
AMOUNT
GIS MHO 103626
Address: Fullerton Avenue and Costa Mesa Street
Lump Sum
Location: Intersection of Fullerton Avenue and Costa
4
5'-6" Deep
Mesa Street
Lump
Sewer In: 8-inch (Southwest and Southeast)
sum
Sewer Out: 8-inch (Northeast)
Work under this item shall include furnishing all labor,
material, and work necessary for rehabilitating the manhole.
GIS MH# 103687
Address: 1967 Church Street
Lump Sum
Location: Church Street halfway between Walnut Street
5
6'-9')' Deep
and East 20111 Street,
Lump
$ -5
Sewer In: 8-inch (Southwest)
Sum
Sewer Out: 8-inch (Northeast)
Work under this item shall include furnishing all labor,
material, and work necessary for rehabilitating the manhole.
GIS MH# 103694
Address: 1946 Fullerton Avenue
Lump Sinn
Location: Southwest manhole in intersection of Walnut
6
59-521 Deep
Street and Fullerton Avenue
Lump
$
Sewer In: 8-Inch (Southwest & Southeast)
sum
Sewer Out: 8-inch (Northeast)
Work under this item shall include furnishing all labor,
material, and work necessary for rehabilitating the manhole.
GIS MH# 103703
Address: 178 Costa Mesa Street
Lump Sum
Location: Costa Mesa Street halfway between Fullerton
7
6'-9" Deep
Avenue and Orange Avenue.
Lump
CIO
Sewer In: 8-inch (Southeast)
Sum
Sewer Out: 8-inch (Northwest)
Work under this item shall include furnishing all labor,
material, and work necessary for rehabilitating the manhole.
CMSD Project No. 324, Phase 2 Bid Form -- 4 of 6
PROJECT NO.324
f �
1..s/t1A�ko
fir,.1 BID FORM
i
BRICK SEWER MANHOLE REHABILITATION (PHASE 2)
BID
ITEMQUANTITY
APPROX.
DESCRIPTION
UNIT
TOTAL
PRICE
AMOUNT
GIS MH# 103749
Address: 120 East 20``1 Street
Lump Sum
Location: Intersection of Church Street and East 20111 Street
8
7'-0" Deep
Sewer In: 8-inch (Southwest & Southeast)
Lump
�
$�Z � `'
Sum
Sewer Out: 8-inch (Northwest)
Work under this item shall include furnishing all tabor,
material, and work necessary for rehabilitating the manhole.
GIS MH# 103817
Address: 141 East 201" Street
Lump Sum
Location: Intersection of Fullerton Avenue and East 20"
9
6'-8" Deep
Street
Lump
$
Sewer In: 8-inch (Southwest & Southeast)
Sum
Sewer Out: 8-inch (Northwest)
Work under this item shall include furnishing all labor,
material, and work necessary for rehabilitating the manhole.
GIS MH# 104024
Address: 2027 Orange Avenue
Lump Sum
Location: Intersection of Sierks Street and Orange Avenue.
10
10'-1" Deep
Sewer In: 8-inch (Southwest & Southeast)
Lump
Sum
$
Sewer Out: 8-inch (Northeast)
Work under this item shall include furnishing all labor,
material, and work necessary for rehabilitating the manhole.
GIS MH# 104070
Address: 2048 Orange Avenue
Lump Sum
Location: Intersection of East Bay Street and Orange
11
11'-0" Deep
Avenue..
Lump
00$
Sewer In: 8-inch (Southwest & Northwest)
Sum
Sewer Out: 8-inch (Northeast)
Work under this item shall include furnishing all labor,
material, and work necessary for rehabilitating the manhole.
CMSD Project No. 324, Phase 2 Bid Form — 5 of 6
SANJT�
PROJECT NO.324
BID FORM
BRICK SEWER MANHOLE REHABILITA'f1ON (PHASE 2)
ORPORAitiv
BID
ITEM
APPROX.
QUANTITY
DESCRIPTION
UNIT
TOTAL
PRICE
AMOUNT
GIS MH# 104073
Address: 220 Sierks Street
Lump Sum
Location: Sierks Street 300' southeast of center line of
12
6'-l" Deep
Orange Avenue.
Lump$�
aQ
Sewer In: 8-inch (Southwest)
Sum
Sewer Out: 8-inch (Northwest)
Work under this item shall include furnishing all labor,
material, and work necessary for rehabilitating the manhole.
GIS MH# 104149
Address: 2076 Orange Avenue
Lump Sum
Location: Orange Avenue 112' northeast of Buoy Street.
13
10'-11" Deep
Sewer In: 8-inch (Southwest & Northwest)
Lump Sum
coo
$ _ $
Sewer Out: 8-inch (Northeast)
Work under this item shall include furnishing all labor,
material, and work necessary for rehabilitating the manhole.
GIS MH# 104198
Address: 2097 Orange Avenue
Lump Sum
Location: Intersection of East 21 st Street and Orange
14
11'-11" D
Deep
Avenue.
Lump
$ �
Sewer In: 8-inch (Southwest, Southeast & Northeast)
Sum
Sewer Out: 8-inch (Northwest)
Work under this item shall include furnishing all labor,
material, and work necessary for rehabilitating the manhole.
TOTAL AMOUNT OF
ITEMS 1 THROUGH 14
00
$3 ,
(TOTAL IN WORDS)
4
Bidders Initials
CMSD Project No. 324, Phase 2 Bid Fonn — 6 of
Note: In case of a discrepancy between the words and figures, the words shall prevail.
A. The General Contractor (Contractor) must perform at least fifty-one percent (51 %) of the total
project work awarded and may sublet no more than forty-nine percent (49%) of the total project
work awarded to any one subcontractor.
The name and location of place of business of each subcontractor who will perform work or labor
or render service to the General Contractor in or about the construction of the work, or
improvements, in an amount in excess of V2 of 1 % of the General Contractor's total bid, and the
portion of the work which will be done by each subcontractor is set forth as follows:
Work to be
Name of Subcontractor
Location of Office Subcontracted
Except as hereinabove provided, Contractor acknowledges and agrees that Contractor will perform
all required work related to this Contract in accordance with Section 4106 of the Public Contract
Code.
B. Person who inspected site ofthe proposed work for your firm:
Name: Date of Inspection:-//
C. Licensed in accordance with the California State Contractor's License Law.
Contractor's License No,
1" 1191
Name of Bidder:
Title of Bidder:
Signature of Bidder:
(President, Owner, or Representative)
Date:
CMSD Project No. 324, Phase 2 Bid Form — 7 of 6