Pre-Bid Conference Agenda - Solar Photovoltaic System at CMSD HQ „3-1„---§iiiiiTq y y Costa Mesa Sanitary District = t. Ch R?oRATEO�"� . . ..an Independent endent S ecial District P P Solar Photovoltaic System at CMSD Headquarters, 290 Paularino Avenue MANDATORY PRE-BID CONFERENCE Wednesday, January 24, 2018 at 9:00 am AGENDA 1. Project Objective — Maximize the District's energy savings under the appropriate SCE "Net Energy Metering”regulations and applicable rate schedules. 2. SCE Interconnection Agreement— TOU grandfathered for 10 years 3. License Required: Class A or Class B with a C10 4. Scope of Work a. 15-Minute Interval Data —Available in Excel b. Design a PV System that will achieve the District's objective. System must include: • Mounting system shall limit roof penetrations. Mounting system design needs to meet applicable local building code requirements with respect to weather and earthquake factors. • Conduit penetrations shall be minimized. • System shall be fixed tilt with an orientation that maximizes annual electricity savings. • All roof access shall be securely locked at the end of each day. • System layout shall meet local fire department, code and Y p , ordinance requirements for roof access. c. Describe the maintenance required to ensure that the PV System continue to operate efficiently during the useful life of the equipment, and should quantify the ongoing costs that District may incur for this maintenance. d. Contractor should describe how the performance of the PV System will be monitored to ensure that District is realizing the anticipated benefits, and should quantify the ongoing costs that District may incur for the monitoring of the system. (I) 0 Protecting our community's health and the environment by providing solid waste and sewer collection services. www.cmsdca.gov CMSD Solar Photovoltaic System MANDATORY PRE-BID CONFERENCE January 24, 2018 Page 2 of 4 5. Interconnection Agreement Requirements a. Single Line Diagram Deficiency Please update Single-line diagram to include Signed PE stamp. Please reference Section 5.2 of most recent NEM Interconnection Handbook for more details b. Plot Plan showing the location of the manual visibly open and lockable open AC disconnect switch with reference to the utility meter (SCE shall approve prior to installation). Note that this is a different plot plan from the plan that is required for NEM Aggregation projects. Please provide a Plot Plant indicating where AC Disconnect in regards to the meter and panel. Please reference Section 5.5.6 of most recent NEM Interconnection Handbook for more details c. Signed PE (from CA licensed Professional Engineer) Stamp on Single Line Diagram for Line-Side Connection Please reference Section 5.2 of most recent NEM Interconnection Handbook for more details d. Final Inspection (AHJ) Please submit AHJ once construction is completed. e. Inverter Settings Please submit inverter settings for each inverter sized greater than 30kW once construction is completed. Please reference Section 6.1 and Appendix D of most recent NEM Interconnection Handbook for more details. 6. Contractor Qualifications and Requirements a. Contractor must have a minimum of five years of experience designing, procuring and installing solar photovoltaic systems. b. Contractor must describe his/her technical approach to the design and construction of the solar project including: • Technical Approach, Design, Equipment, Installation Panel, inverter, racking specifications, equipment and workmanship warranties • Exhibits showing proposed layouts and system single line diagram • Report indicating electricity production of the PV System capabilities of battery storage • Projected 20-year financial performance of system • Proposed monitoring system/solution • Maintenance plan offered for the project CMSD Solar Photovoltaic System ' MANDATORY PRE-BID CONFERENCE January 24, 2018 Page 3 of 4 c. Contractor must describe the guaranteed level of year-1 PV System electricity generation, as well as any guaranteed level of year-1 reduction in SCE charges. Specify the forecasted reduction in generation and savings for 20 years, and proposed remedies if system does not meet anticipated targets. d. Contractor must be registered with the California Department of Industrial Relations 7. SCE Information a. Engineer Name: Ricardo Santos Engineer Email: ricardo.s.santossce.com b. Signage Requirements SCE may at its discretion require decals to be installed on generation facilities. c. Contractor contact the SCE Engineer assigned to District's project to coordinate decal pick up at the local service center. d. Contractor will submit the following prior to scheduling the commissioning test and to expedite the technical review: • Photos of the manual, visibly open, and lockable AC disconnect; • A plot plan showing the location of the manual, visibly open, and lockable AC disconnect with reference to the utility meter (SCE shall approve prior to installation) , • 8. Scheduling a Commissioning Test The assigned SCE Engineer will work with you to try to schedule a commissioning test of the project soon after the final inspection by the City of Costa Mesa. Please let the Engineer know in advance when you anticipate scheduling the final inspection , 9. Bonds & Insurance a. 10% Bid Bond b. Insurance • General Liability - $1,000,000 per occurrence, $2,000,000 general aggregate for bodily injury, personal injury and property damage, including, without limitation, blanket contractual liability, and a $2,000,000 completed operations aggregate • Automobile — Coverage for any owned, hired, non-owned, or rented vehicles in an amount of 1,000,000 combined single limit of each accident. • Umbrella or excess liability - $4,000,000 that will provide bodily injury, personal injury, and property damage liability coverage at CMSD Solar Photovoltaic System MANDATORY PRE-BID CONFERENCE January 24, 2018 Page 4 of 4 least as broad as the primary coverages. Please adhere to the terms and conditions identified in the bid specifications • Workers' Compensation - $1,000,000. c. Payment and Performance Bonds in the amount of 100% of the Contract Sum 10.Written Questions due by 12:00 pm on Friday, February 2, 2018 Do AJc%f • 11.Bids Due: 10:00 am on Thursday, February 8, 2018 12.Roof Top Walkthrough 13.Adjourn