Loading...
2017_06_22_specialThursday, June 22, 2017 Board of Directors Special Meeting 290 Paularino Avenue, Costa Mesa 5:30PM A. OPENING ITEMS        Subject 1. Call to Order Meeting Jun 22, 2017 ­ Board of Directors Special Meeting Type Procedural A. OPENING ITEMS        Subject 2. Public Comments Meeting Jun 22, 2017 ­ Board of Directors Special Meeting Type Procedural B. ENGINEER'S REPORTS              Summary Construction of the improvements was completed on June 2, 2017, therefore it is appropriate for the District to accept the improvements and file a notice of completion. The project is part of the force main replacement and rehabilitation program and the purpose of the project was to replace the force main prior to it reaching the end of its life expectancy and sustaining a break or rupture in the line.  Failures in force mains cause large sewer spills.   Staff Recommendation The Board of Directors approves the following action: 1. Accept improvements as completed and file a Notice of Completion. 2. Authorize payment of 5% retention 35 days after Notice of Completion is recorded. 3. Exonerate Labor and Material Bond 35 days after Notice of Completion is recorded and exonerate Faithful Performance Bond one year after Notice of Completion is recorded.  Analysis Force mains carry high flows under pressure and a fracture or break normally results in a large sewer spill. A proactive force main rehabilitation program is an essential element in a comprehensive sewer system management program.   District staff utilized a no­dig technology, horizontal directional drilling (HDD), to install the force main.  The use of HDD minimized disturbance of the street surface and allowed the project to be completed in a shorter timeframe and for less cost.  HDD was also used to install the Harbor Force Main.   Legal Review District Counsel prepared and signed the construction contract for the project.   Environmental Review The replacement of the force main and other work being contemplated is categorically exempt under the California Environmental Quality Act (CEQA) (Public Resources Code Section 21000 et. seq.) under Section 15301 as a “Class 1” “minor alteration of existing public or private structures”, as further described in Section (b) as “Existing facilities of both investor and publicly­owned utilities used to provide .... sewerage ...”.   Financial Review The total Victoria Force Main Replacement Project #313 budget is $453,000.  The project to date expenses total $266,653, including encumbrances.  The remaining available budget is $186,347 which is sufficient to cover expenses incurred but not yet billed and retention payable.    Public Notice Process Copies of this report are on file and will be included with the entire agenda packet for the June 22, 2017 Board of Directors special meeting at District Headquarters and on District’s website at www.cmsdca.gov.   Alternative Actions Refer the matter back to staff for additional information.     File Attachments Notice of Completion #313.060617.docx (16 KB) Subject 1. Project #313 Victoria Pump Station Sewer Force Main Replacement: Accept Improvements, File Notice of Completion, Exonerate Bonds Meeting Jun 22, 2017 ­ Board of Directors Special Meeting Type Action Recommended Action The Board of Directors approves the following action:  1) Accept improvements as completed and file a Notice of Completion.  2) Authorize payment of 5% retention 35 days after Notice of Completion is recorded.  3) Exonerate Labor and Material Bond 35 days after Notice of Completion is recorded and exonerate Faithful Performance Bond one year after Notice of Completion is recorded. Goals 1.6 Evaluate Force Main Conditions on a Regular Basis C. CLOSING ITEMS              Subject 1. Adjourn Meeting Jun 22, 2017 ­ Board of Directors Special Meeting Type Procedural