Loading...
Minutes - Board - 2005-10-18• • • Costa Mesa Sanitary District Minutes of Safety /Loss Control Committee Meeting October 18, 2005 Present Rob Harriers Tom Fauth Debbie Bjornson Gerry Vasquez Joan Revak Paul Guzman Joe Limon Absent Yefim Tsalyuk Don Brown Discussion: Manager /District Engineer CMSD Assistant Manager Permit Processing Specialist Maintenance Supervisor, City of Costa Mesa Board Secretary /Program Manager /Clerk of the District CMSD Inspector CMSD Inspector Engineer Senior Maintenance Technician I. CMSD # 175 - OCSD Cooperative Projects Grant — Televising Sewer Lines Rob reported National Plant Services has signed the agreement to perform the televising and Rob will be preparing a new schedule. 11. Miscellaneous Work The committee discussed the miscellaneous work required at a few of the pumping stations: A new PVC vent pipe is needed at the Elden Pumping Station, the vent pipe should be moved to the back of sidewalk at the Harbor Pumping Station, and new wet well doors are needed at the Victoria Pumping Station and the Canyon Pumping Station. Rob will make arrangements with Schuler Engineering to make the repairs. Schuler Engineering will also be reconfiguring the Westbluff Pumping Station valve vault to accommodate the new force main being constructed by the adjacent development. III. Construction Checklist Paul recommended the District have a checklist so contractors would have a clear understanding of the requirements needed prior to beginning construction. The committee agreed with the recommendation and the items on the checklist were discussed. Rob will prepare a draft checklist for review and Joan will print upon completion. IV. CMSD Sewer Spills to date • Tom provided his matrix of sewers spills to date for 2005. The District has had only two sewer main spills since January 1, 2005. V. Tailgate Meetings and Field Crew Safety Tom will continue holding the monthly tailgate meetings with the field crews. VI. Pumping Station Security At the previous Safety Committee meeting, Joe reported that four of the stations have no lock on the access door to the wet well due to the lock mechanism having deteriorated from the sewer gas atmosphere. Gerry followed up and installed the locks. VII. Code of Safe Practices SDRMA recommends the member agencies adopt a Code of Safe Practices for all work performed by the staff members of the agency. Tom proposed additional categories to cover sewer cleaning and pump station maintenance. VIII. Project Updates • Paul reviewed the Project #168 Phase I completion of the gravity sewer mains in the intersection of Irvine Avenue and Mesa Drive. IRWD will be performing additional water line construction in Anniversary Lane and Riverside Drive and Paul, Joe, and Rob are insuring there is proper separation between the water line and the existing CMSD sewer lines. IX. Sewer Cleaning Crews Gerry noted that the cleaning crews are cleaning the City storm drains system prior to returning to cleaning sewer crews. The crews are still cleaning hot spots on Thursdays and Fridays. Next meeting to be December 6, 2005. Distribution: CMSD Safety Committee Members Bill Morris, Director of Public Services, City of Costa Mesa Terri Cassidy, Human Resources Manager, City of Costa Mesa CMSD Board of Directors, at November 2005 regular meeting. • 2