Invoice - Schuler - 2014-03-05Corp. March 5, 2014 Costa Mesa Sanitary District 628 West 191h Street Costa Mesa, CA 92627 Attention: Rob Hammers Reference: 21" Pump Station Subject: Extra Work — Separation of Vaults - Testing of Gravity Flow Option Gentlemen, 564 W. Bateman Circle Corona, CA 92880 -2011 (951) 738 -9215 Fax: (951) 738-0162 Contractor's License No. 389852 We have completed the rework of this station. There were a couple of extra work items which we encountered: 1) We were asked to assist the District in determining if the station could safely bypass itself using a high wet well level and gravity flow to the Eldon Station. It was necessary to staff the Eldon and 21St Site for 24 continuous hours to do this. This test was successful and we were able to eliminate the bypass pumping we had estimated it would take to do this. This is reflected as a credit against the cost to man the station testing. Additionally we were able to use salaried staff for a portion of these hours (we are billing only for their lost time) 2) The plans indicated the wet well and valve vault were directly adjacent to each other. This is the basis upon which we bid the work. It was discovered during our preliminary field measurement that the stations actually had a space between them. We were required to remove the sidewalk in the area of the separation; excavate and shore the space down to the existing pipes. These pipes were in a large diameter sleeve which we removed during construction. We had to increase the amount of stainless pipe in this area and weld two wedding band joints to make the closure(s). We backfilled the area of the excavation using a 1.5 sk slurry and hauled the earth and concrete rubble away. Finally we re- poured the sidewalk and reset the chemical enclosure. The accounting for these items is as follows: 24 Hours Backflow Test $ 2,186.57 Credit for Bypass ( 3,400.00) Expose Discharge Headers $ 5,755.20 echuler engineering Corp. 564 W. Bateman Circle Corona, CA 92880.2011 (951) 738 -9215 Fax: (951) 738 -0162 Contractor's License No. 389852 Backfill Void $ 1,667.56 Replace Improvements $ 1,799.85 Total Extra $ 8,009.18 Resp tfully, Bruce A. Schuler President Progress Payment No i Date: 3/4/2014 Owner: Costa Mesa Sanitation District 628 W. 19th Street Costa Mesa, CA 92627 Attn: Accounts Payable Contractor: Schuler Engineering Corp. 564 W. Bateman Circle Corona, CA 92880 -2011 Project No.: 201 Project Name: 21st Street Pumping Station Pipe and Valve Replacement PO Number: Pay Request No.: 1 Pay Period: March 1 -March 31 Total Contract Completed To Date 73,776.18 Amount of Payment to Schuler Engineering 73.776.18 For Current Progress Payment a M a 0 a` a m t d N T ro m m a U) m z e w � 0 j0 w crow°. �o�. ¢ co'O0 LO N 0 1n °o rr— OD OD w �o > W ''a 00 M (O O rM� OO Fy 2 a ~ a r.co . .00 0) .O. w r ol (O CO M M —J LLJ Q w . O 00 O OD W > Q 0 M co O O N J° r M O O W F O 0o 0 N M F m w ^.co E V w � rn 0 ( ° a (0 a 0 to C F- 00 U z O � C7 c w . °:° Z—a U Q 00 z w 0 W v j'0 ° Z OO w w z (L 7m(n j 21 St St Flow Test -kp noleui i me. z i s_[ a[ neouua 270.90 uate of Extra WorK.2119 to 2120 Project# _ Date of Report: 2/21/14 Subs I Special. Work Performed by Schuler Engineering Total Extra Cost 1726.41 G & A 14.00% Description of Work: 24 Hr Test Bsckflow to Elden 1968.11 Markup 10% Equipment Subtotal Hours Rate Total Pickup - Panzer Total Extra 8 19.35 154.8 Pickup - Schuler 3 19.35 58.05 Pickup - Sohl 3 19.35 58.05 0 Total Equipment 270.9 Labor Reg Hours Reg Rate O.T. Hours O.T. Rate Total Labor Chad Sohl 12 35.98 431.76 Kevin Panzer 12 48.75 585 B. Schuler 3 53.3 159.9 B. Sohl 3 92.95 278.85 Total Labor 1455.51 Total Materials Subs I Specialists Total Subs /Specialists .71 Equipment 270.90 Labor 14.5.5.51 Materials 0.00 Subs I Special. 0.00 Total Extra Cost 1726.41 G & A 14.00% 241.70 Subtotal 1968.11 Markup 10% 196.81 Subtotal 2164.92 Bond 1 % 21.65 Total Extra 2186.57 Page 1 Exc Void Between Vaults -kp Project Title: 21 st Street Rebuild Date of Extra -Work-.2/24/14 Project # Date of Report: 3/4/14 Work Performed by Schuler Engineering Description of Work: Vault Separation: Remove Sidewalk, Move Chemical Housing, Excavate & Shore Hole, Hand Excavation Equipment 154.80 Labor Hours Rate Total Service Truck Subs / Special. 2037.50 8 19.35 154.8 G & A 14.00% 636.16 Subtotal 5180.19 0. 518.02 Subtotal 5698.21 Bond 1% 0 Total Extra 5755.20 0. Total Equipment 154.8 Labor Reg Hours Reg Rate O.T. Hours O.T. Rate Total Labor Matt Soh1 8 81.2 649.6 Chad Sohl 8 35.98 1.5 4635 357.365 Mark Lechuga 8 66.05 1.5 86.35 6.57.925 Dennis Weber 1 95 95 Total Labor Speed Shores 10' of 8" 316 ss pipe 8" 316ss Wedding Bands Total Materials Subs / Specialists Conc Coring Ticket Total Subs / Specialists Totals 1759.89 2 122.04 10 40.5 405 2 32.4 64.8 591.84 Equipment 154.80 Labor 1759.89 Materials 591.84 Subs / Special. 2037.50 Total Extra Cost 4544.63 G & A 14.00% 636.16 Subtotal 5180.19 Markup 10% 518.02 Subtotal 5698.21 Bond 1% 56.98 Total Extra 5755.20 DATE Page 1 2,037.50 2037.5 21 St - Backfill Void Bewteen Vaults -kp rtuleut 1 [tie. L 18t Jtreel KeDullo Uate or Extra WorK: 2/21/14 Project # Date of Report.3 /4/14 Work Performed by Schuler Engineering Description of Work: Backfill Void Between Vaults Equipment Hours Rate Total Service Truck 1 19.35 1 Total Equipment 19.35 Labor Reg Hours Reg Rate O.T. Hours O.T. Rate Total Labor Matt Sohl 1 81.2 81.2 Total Labor 81.2 Materials 12 Cy 1 Sk Slurry 1216.08 Total Materials 121 Subs / Specialists Total Subs /Specialists 0 Equipment 19.35 Labor 81.20 Materials 1216.08 Subs / Special. 0.00 Total Extra Cost 1316.63 G & A 14.00% 184.33 Subtotal 1500.96 Markup 10% 150.10 Subtotal 1651.05 Bond 1% 16.51 Total Extra 1667.56 ACCEPTED Page 1 21 St - Finish Sidewalk -kp MOJeOE 1 Me: L 151 A[reet KeMia uate OT txtra VVOrx: 21i Project # Date of Report:2 /28/14 Work Performed by Schuler Engineering Description of Work: Pour and Finish Sidewalk ant Hours Rate Total Truck 4 19.35 77.4 0 0 Total Equipment 77.40 Labor 77.4 Labor Reg Hours Reg Rate O.T. Hours O.T. Rate Total Labor Chad Sohl 8 35.95 287.6 Total Labor 287.6 Materials 2 Cy 3250 PSI 406.08 Total Materials 406.08 Subs / Specialists Finisher 650.00 Total Subs / Specialists 6501 Equipment 77.40 Labor 287.60 Materials 406.08 Subs /Special. 650.00 Total Extra Cost 1421.08 G & A 14.00% 198.95 Subtotal 1620.03 Markup 10% 162.00 Subtotal 1782.03 Bond 1% 17.82 Total Extra 1799.85 DATE Page 1 BILL TO: COMMITMENT TO SAFETY & SERVICE SINCE 1973 RENTAL- SALES• SERVICE TOM MALLOY CORP., 4ha e'.e4 SCHULER ENGINEERING I�aa Kai 564 W. BATEMAN CIRCLE CORONA CA 92880 -2011 4 SHIP TO: 2100 NEWPORT BLVD. COSTA MESA OC 889 A3 CORPORATE OFFICE BANNING 951 -849 -1611 DAILY WEEKLY DAILY 1 IYEACCFPI TRENCH SHORING COMPANY CORONA 951.734.4290 AIR SAG 8 " -12" BLOCK VISA 636 EAST ROSECRANS AVE, FULLERTON 714 -879 -1005 2 SAFETY SHEET INCLUDED WITH ORDER LAKE FOREST 949 - 454 -0858 LOS ANGELES, CA 90059 LAS VEGAS 702- 651.0920 7 7 310 - 327.5554• FAX 310- 323.9648 MOORPARK 805 - 529.4614 SHT705 TREK -SHORE 70X106 X 5' TrenchShoring.com SAN DIEGO 858. 530 -2500 FRI FEB 21/14 Dl$(;p SHTOSO TREN -SHORE HYDRAULIC PUMP CONTRACT CONTRACT #:384121 DATE PRINTED: 02/20/2014 16:06 DIVISION: 2 PO #: CUSTOMER: 4316 TEL: 951- 738 -9215 308 #: 51316 TERMS: NET 30 PAGE: 1 MD PRODUCT. AI, DESCRIPTION - I MINIMUM . DAILY WEEKLY DAILY I 'DATE OUT ...I QTY -I AMOUNT. $80812 AIR SAG 8 " -12" BLOCK 45 45 135 FRI FEB 21/14 2 SAFETY SHEET INCLUDED WITH ORDER S99998 AIR BAG nWLRTION LINE 7 7 21 FRI FEB 21114 2 SHT705 TREK -SHORE 70X106 X 5' 44 44 132 FRI FEB 21/14 2 SHTOSO TREN -SHORE HYDRAULIC PUMP 25 25 75 FRI FEB 21/14 1 SHT050 TREH -SHORE REG TOOL 50" FRI FEB 21/14 1 44x2 - 006 ,q5KA U3 TI- I d 1112% PER MONTH LATE CHARGE ON BALANCES OVER 00 DAYS PAST DUE. RECEIPT OF THE ABOVE IS ACKNOWLEDGED AND PROVISIONS STATED ON THE REVERSE SIDE ACCEPTED, BE IT RENTAL OR SALE. RECEIPT OF THE ABOVE EQUIPMENT WILL BE DEEMED TO CONSTITIUTE ACCEPTANCE AND AGREEMENT BY THE LESSEE TO ALL OF PROVISIONS, TERMS AND CONDITIONS HEREOF AND TO THIS RENTAL AGREEMENT. V +:1q, ra:erm:a4Ta:aUaxayaL ram��rm4aAra:1 PantAlame WILL CALL WARNING TRENCH PLATES,'TRENCH TOPS" CHANGE THE HARACTER OF THE SURFACE. PROPER CAREAND ADVANCE SIGNAGE IS RECOMMENDED WHEN 'TRENCH PLATES", "FRENCH TOPS "ARE IN USE. YET CONOITIONS ENHANCE THE CHANGES TO THE SURFACE. "SLIPPERY WHEN WET' CUSTOMER ORIGINAL INVOICE Ph Stainless Remit to: N. Sheridan St. Number: 1472027 P.O. Box 576690 one, CA 92880 Modesto,, CA 95357 Date: 02/26/14 Page: I Cust P/O no: S1316 40.4444 Phone Ordered by: BRIAN 40.4460 Fax Blillng terms: 2W 10, NET 30 gfist8inless-com Order date: 02/21/14 Order no: 5071254 � 9CH9.50 Ship-to: No: SCH950 -jNEERING CORP. SCHULER ENGINEERING CORP. CIRCLE 564 W. BATEMAN CIRCLE 92880-2011 CORONA, CA 92880 -2011 1 %du . bt' . no EYescrl tion Ordered ShIoDe Not Price Extens on WP16080 60.000 FT 60.000 37.50 FT 2,250.00 811 SIO 316/316L A312 PIPE HT# 22SX37PO80 3- EA-- - - - - -3 90.30 SA- 270.90 B-L—IrM #--IPS--PL-ATR-SL-IP-ON--34SL DELIVER MONDAY THE 24TH 11 IJ4-/Cj Co rk Shipped via: OUR TRUCK ALL PRODUCTS SUBJECT TO ORIGINAL Net Sales 2,520.90 Frt terms: PREPAID MANUFACTURER WARRANTY. GFI NOT RESPONSIBLE FOR ANY EXPENSES CAUSED By I Sales Tax B s6 201.67 F.O.Bi SOURCE DEFECTIVE PRODUCT. PAST-DUE ACCOUNTS Freight .00 Ship date: 02/24/14 M, C .00 Document no: Less Deposit .00 BAR SalesPerson: RICK SANCHEZ You may deduct $50.42 if mailed by 0 1 4 Printed: FEB 26, 2014 8:07 TOTAL (US)$ CUSTOMER ORIGINAL jl. _er_ 10 20141 I� NVOICE L.._ IL 5301 uler nginceo pq PIPE FABRICATION DATE: February 27, 2014 10757 Fremont Ave. Ontario, CA 91762 PH: (909) 465 -0640 FAX: (909) 465-0943 Sold To: Schuler Engineering Corp. 564 West Bateman Circle Ship To: W/C Corona, Ca. 92880 POSTED CONCRETE (I =)ORING 0 M D 0 N V INVOICE NO 14005 Orange Ave. LA411872 Paramount, California 90723 562 -634 -4021 Fax 662.634 -2305 Contractors License 368276A FID 95- 3139576 SCHULER ENGINEERING 564 FW. BATEMAN CIRCLE CORONA, CA 92880 (951) 738 -9215 A STREET WORK J 0 114 21 ST. STREET OR BE NEWPORT BLVD. s COSTA MESA, CA S 35 CUSTOMER PURCHASE ORDER NO. S1316 CUSTOMER JOB JUMBER BILLING DATE 03/04114 AREArTERR. RAUL D OPER. NO. JOB TICKET NUMBER DATE OF WORK TYPE OF WORK PERFORMED AMOUNT 35 416421 02/24/14 CONCRETE SLAB SAWING - MINIMUM 330.00 35 416421 02/24/14 5.5 HRS BOBCAT COMBO 742.50 35 416421 02/24/14 2 HR MIN. BREAKER 370.00 35 416421 02/24/14 MOBILIZATION 180.00 35 416421 02/24/14 2 TRIPS TO DUMP 190.00 35 416421 02/24/14 DUMP FEES 225.00 Tax: 0.00 Total: 2,037.50 THIS INVOICE IS DUE AND PAYABLE BY 04103/14 AFTER - WHICH IT BECOMES DELINQUENT AND SUBJECT TO A 1 1 /2% SERVICE CHARGE, OUR CONTRACT ALLOWS FOR ATTORNEY FEES FOR COLLECTION OF DELINQUENT ACCOUNTS CONDITIONAL WAIVER AND RELEASE UPON PROGRESS PAYMENT Upon receipt by the undersigned of a check from SCHULER ENGINEERING in the sum of 2,037.50 payable to Concrete Coring Company and when the check has been properly endorsed and has been paid by the bank upon which it is drawn, this document shall be effective to release pro tanto mechanics lain, stop notice or bond right the under- signed has on the job of STREET WORK located at 114 21ST. STREET to the following extent this release covers a PROGRESS payment for labor, services, equipment or material furnished to SCHULER ENGINEERING on 02124114 for invoice number 411872 only and does not cover any retention before or after the release date, extras or Items furnished after said date. Before any recipient of this document relies on it, said party should verify evidence of payment to the undersigned. Concrete Coring Company BY TITLE NKIONX READY MIXED CONCRETE CO. 15821 Ventura Blvd., Ste 475 Encino, CA 914364748 SCHULER ENGINEERING CORP. 564 W. BATEMAN CIRCLE CORONA, CA 92880 -2011 00006922 02/27/2014 461897 1 PRODUCT RECAP 12.00 S10100 1.00 MIN 2.00 ENERGY 2.00 ENV /FEE 1SK SAND SLURRY MINIMUM LOAD CHARGES ENERGY ENVIRONMENTAL FEE TAXABLE AMOUNT 1126.00 EXEMPT AMOUNT 0.00 SALES TAX 90.08 1216.08 8186 21ST & NEWPORT BLVD COSTA MESA 02/27 139 - 193621 9.00 CY 1SK SAND SLURRY 73.000 52.56 709.56 02/27 139 - 193621 1.00 LD ENERGY 20.000 1.60 21.60 02/27 139- 193621 1.00 LD ENVIRONMENTAL FEE 30.000 2.40 32.40 02/27 139 - 193622 3.00 CY ISK SAND SLURRY 73.000 17.52 236.52 02/27 139 - 193622 1.00 LD MINIMUM LOAD CHARGES 150.000 12.00 162.00 02/27 139 - 193622 1.00 LD ENERGY 20.000 1.60 21.60 02/27 139 - 193622 1.00 LD ENVIRONMENTAL FEE 30.000 2.40 32.40 JOB TOTAL LINE 1216.08 PRODUCT RECAP 12.00 S10100 1.00 MIN 2.00 ENERGY 2.00 ENV /FEE 1SK SAND SLURRY MINIMUM LOAD CHARGES ENERGY ENVIRONMENTAL FEE TAXABLE AMOUNT 1126.00 EXEMPT AMOUNT 0.00 SALES TAX 90.08 1216.08 NATIONAL READY MIXED CONCRETE CO. LF 4035 SOUTH GATE Ej IRWINDALE E] SANTACIAPJTA [j GLENDALE ❑ VANNUYS 323 -564 -1866 626- 303.7755 661. 252.6181 818. 243.4243 818- 786 -2210 ❑ ARTESIA E] SUN VALLEY ❑ SOLEDAD ❑ MOORPARK ❑ OGRONA • 562 - 865.6211 818. 768 -0050 661 - 252 -8181 805 -529 -1673 951 -547 -3637 ® IRVINE El CANOGA PARK Website: www.ilationalcemenLwm/nmlc 949 - 552 -5566 818 - 884.0893 ADDITONALCHdENr EXECUTIVE OFFICES • ACCOUNTING & CRFDTT • 15R21 VRNTT TRA RT.VD- SUITE 475. ENCINO. CA 91436-4778 CUSpQNIER Schuler Engineering Corp. HONENO.951- 738 -9215 FAX NO 951- 738 -0162 DATE 228/14 NA ORTYPEOFTOB Sidewalk Repair Description: CONTACT Brian GENERAL CONTRACTOR S- 59530 roe ADDRFm 21^ & Newport Blvd. CrrY Costa Mesa CusrobmR a 6922 BASE ADDITONALCHdENr LESSMAENTWR.L MAP LOCATION 889 A -2 PRICE S /Pmt CURICYARD WDLBECHARGEDAT S IPERSACK BEREDUCEDBY S IPERSACK 8 a�' 4MNUCESPERCUBICYARDUNLOADTNOTBE WILL BEALLOWED. EXCESSTNIEWILBECHARGEDAT S 120.09 / PER HOUR PLANT: Irvine ZONE AN ENVmONAf MALFEE SPECIAL CBARGES WILL APPLY TO DELIVERIES MADE ESTWA' � wILLEEcHARGEnOF s 30.00 /FERTIG:Ef OTHERTRAN MONDAY - FRIDAY 5:00A.M.TO3:0DPM I QuANmv 2 ORDERS ARETAKE N WITH THE INTENT TODRIXA RCONCREFE70 THE BEST OF OUR ABILITY. THERE IS NO GUARANTEE AS TO TR.m ORRATE OF DELIVERY AND NATIONAL ACCEPTS NO UABNTTV FOROVERTNm ACCRUED BYRUYER PRICES ARENOTPERPLAN ANDIOR SPECIECA77ON UNLESS SPECIFICALLY NOTED OTHERWISE QUOTED PRICES ARE BASED ON 9 CUBIC YARD LOADS F.O.B. JOBSML ONDIUVFRDS LESS THAN 9CUBIC YARDS ANADVIIONALCHARG5 WILL RE JdADR IFNATIONAL IS NOT AWARDED TIES PROJECT WITHIN 30 DAYS, QUOTEDPRICES ARENEGO'MBLE AT SELLERS OPTION. QUWMPRICES ARE FORTHE ENTIRE PROJECT . ONLY. WHEN NATIONAL IS AWARDEDMATFRIALSUPPLY FORTHIS PROJECT. PRICES AREGOODTNRGuaH 3/31114. End ALL PRICES ARE PLUS TAX Temc Na Dumfk=pL DdiagmtifMpeidiofawithio30dgsoFlowimdtl Ddkq=1 eccw HI pay a lam Peyornt Cbnoo the MaofIQ%pa emnmoathe maid balmmmlil the emamt is paidmfoR Rlmgaevl ecmmts emmbjrelmsupemim evd closwe wi�ho Nrtherao6x mthe wwlla mEOOUmSmmmUect thiseso susoeeble 's Les and mASw0lhe 'db dw LbflOa[f. * ** Mixes priced for NORMAL shrinkage using local aggregates * ++ Mix 8 Price Description: 550x2 = 151 S- 59530 $75.50 560 -C -3250 A /No Flyash 1-}5 s), -,-� + 3u i- ao 8 a�' X10(0. DIJJ * ** Quoted mixes are specifically not NSP /ANSI Section 61 compliant. All costs associated with compliance are the responsibility of the Buyer. * ** Ica can he provided to cool fresh concrete at additional cost. * ** Prices are based on the allowance of 90 thins. to unload fresh concrete from the time water is first added to the mix. A $20. 00 PER DELIVERY TICKET FUEL SURCHARGE WILL BE ADDED PRICES QUMF.D ARE FOR CONCRETE aATCRRD AND DEL PM" AT THE THE TIME OF IiATCBIISG AND DSIIVERY. RESPECTFULLY SUBMITTED FOR NATIONAL READY MIXED CONCRETE COMPANY BY: Keith Hutcheson