Loading...
10 - A - CCTV Interval for Entire Sewer SystemWDR Survey of Line Cleaning and Televising Agency Does agency Cleaning Desired or Miles of # of Crews own TV Truck Interval Current CCTV Sewer Main Interval Huntington Beach Yes 1.5 years 5-7 years 351 4 Orange Yes 5 years 10 years 312 1 Contractor for arterial street cleaning and video Garden Grove S.D.Yes 2 years 7-10 years 327 2 Fullerton Yes 1.5 years 5 years 320 3 cleaning, 1 CCTV El Toro W.D.Yes (2)1.4 years 5 years 152 1 Placentia No 3 years 10 years 76 0 Costa Mesa S.D.No 2 years 5-10 years 219 1.5 .5 is for NPS, a private contractor Buena Park No 2 years 5 years 168 1 Fountain Valley No 1 year 5 years 131 1 Brea Yes 1 year 10 years 119 1 Santa Ana Yes 1 year 8 years 390 2 Newport Beach Yes 1.5 years 5 years 202 Revised: 3/26/12 WDR Survey of Line Cleaning and Televising