RBH - Project #197 Fee Table Contract Admin InspectionSCOPE OF WORK & FEE TABLE
Client:
Project:
Job No.
Date:
Task Description
Pre-Construction
Engineering and Management
Survey Work
Inspection
Total Labor Hours and Fee
In-House Labor
1)
2)
3)
4)
1
1.1
1.2
1.3
1.4
1.5
2
2.1
2.2
2.3
2.4
2.5
2.6
2.7
2.8
3
3.1
3.2
3.3
4
4.1
4.2
Managing Engineer
Project Engineer
Project Inspector
Survey Crew
Costa Mesa Sanitary District (CMSD)
CMSD #197 System Wide Sewer Reconstruction Phase III
Contract Administration (75 working days)
62 Line Segments
6/27/2013 Revised
Arrange Preconstruction Meeting
Process Contract, Insurance, Bonds
Prepare Progress Payment Spreadsheet
Attend Preconstruction Meeting
Prepare and Distribute Notice of Construction
Issue Notice to Proceed
Review and respond to shop drawings
Periodic site visits
Prepare written correspondence as appropriate
Reveiew and prepare monthly progress payments
Prepare updates for Board of Directors
Liaison with and reports to City of Costa Mesa
Liaison with and reports to City of Newport Beach
Prepare As-Built Plans
Prepare Staff Report for Board of Directors acceptance of improvements
Pre-Calcs for Sewer Staking
Establish Control and Stake Sewer Main
Check grades during construction (# trips)
Check final grades
Construction Observation (75 working days)
As-built plans
Organize notes and daily reports
Project Team
Rob Hamers
Yefim Tsalyuk
Joe Limon
Tim Fettig, Rich Dupree
ME
1
2
1
2
1
1
2
2
1
2
4
2
2
2
2
0
0
0
1
28
PE
2
1
2
2
1
1
6
2
2
1
2
2
15
0
0
0
0
1
40
Class
ME
PE
PI
SC
PI
1
0
165
166
28
40
166
0
SC
0
0
0
0
PREPARED BY:
Robin B. Hamers, PE
District Engineer
In-House Fee
Rate
96.5
96.5
64.5
230
Total Fee
17269
Total Cost
2702
3860
10707
0