Loading...
RBH - Project #197 Fee Table Contract Admin InspectionSCOPE OF WORK & FEE TABLE Client: Project: Job No. Date: Task Description Pre-Construction Engineering and Management Survey Work Inspection Total Labor Hours and Fee In-House Labor 1) 2) 3) 4) 1 1.1 1.2 1.3 1.4 1.5 2 2.1 2.2 2.3 2.4 2.5 2.6 2.7 2.8 3 3.1 3.2 3.3 4 4.1 4.2 Managing Engineer Project Engineer Project Inspector Survey Crew Costa Mesa Sanitary District (CMSD) CMSD #197 System Wide Sewer Reconstruction Phase III Contract Administration (75 working days) 62 Line Segments 6/27/2013 Revised Arrange Preconstruction Meeting Process Contract, Insurance, Bonds Prepare Progress Payment Spreadsheet Attend Preconstruction Meeting Prepare and Distribute Notice of Construction Issue Notice to Proceed Review and respond to shop drawings Periodic site visits Prepare written correspondence as appropriate Reveiew and prepare monthly progress payments Prepare updates for Board of Directors Liaison with and reports to City of Costa Mesa Liaison with and reports to City of Newport Beach Prepare As-Built Plans Prepare Staff Report for Board of Directors acceptance of improvements Pre-Calcs for Sewer Staking Establish Control and Stake Sewer Main Check grades during construction (# trips) Check final grades Construction Observation (75 working days) As-built plans Organize notes and daily reports Project Team Rob Hamers Yefim Tsalyuk Joe Limon Tim Fettig, Rich Dupree ME 1 2 1 2 1 1 2 2 1 2 4 2 2 2 2 0 0 0 1 28 PE 2 1 2 2 1 1 6 2 2 1 2 2 15 0 0 0 0 1 40 Class ME PE PI SC PI 1 0 165 166 28 40 166 0 SC 0 0 0 0 PREPARED BY: Robin B. Hamers, PE District Engineer In-House Fee Rate 96.5 96.5 64.5 230 Total Fee 17269 Total Cost 2702 3860 10707 0