RBH Inspection Proposal - 2013-06-27Revised June 27, 2013
Board of Directors
COSTA MESA SANITARY DISTRICT
628 West 19th Street
Costa Mesa, CA 92627
RE: #197 System Wide Sewer Reconstruction Phase III
Proposal for
Contract Administration/Inspection Services
Dear Directors:
RBH, Inc. is pleased to submit this proposal for contract administration/inspection services for the construction phase
of the project, which consists of repairing 67 line segments with one or more Grade 5 deficiencies. The project will have a 75 working day construction period.
The attached proposal
includes all services necessary to successfully administer the project including project management, engineering, and inspection. No surveying is needed. Services for the District are
typically billed on an hourly basis with the not to exceed total as shown in the attached fee table. The cost per line segment in Phase II contract admin/inspection was $257.77 and
the cost in the attached fee table is $257.75 per line segment.
Thank you for the opportunity to prepare this proposal. Please call me at (714) 293-2727 (cell) if there are questions
or comments.
Sincerely,
Robin B. Hamers, PE
RCE 31720