Loading...
RBH Inspection Proposal - 2013-06-27Revised June 27, 2013 Board of Directors COSTA MESA SANITARY DISTRICT 628 West 19th Street Costa Mesa, CA 92627 RE: #197 System Wide Sewer Reconstruction Phase III Proposal for Contract Administration/Inspection Services Dear Directors: RBH, Inc. is pleased to submit this proposal for contract administration/inspection services for the construction phase of the project, which consists of repairing 67 line segments with one or more Grade 5 deficiencies. The project will have a 75 working day construction period. The attached proposal includes all services necessary to successfully administer the project including project management, engineering, and inspection. No surveying is needed. Services for the District are typically billed on an hourly basis with the not to exceed total as shown in the attached fee table. The cost per line segment in Phase II contract admin/inspection was $257.77 and the cost in the attached fee table is $257.75 per line segment. Thank you for the opportunity to prepare this proposal. Please call me at (714) 293-2727 (cell) if there are questions or comments. Sincerely,  Robin B. Hamers, PE RCE 31720