Summary
For calendar year 2013, the Board of Directors established 21 goals for me to achieve.
Through good teamwork and cooperation from staff, the following is a summation on how
20 out of 21 goals were achieved.
Staff Recommendation
That the Board of Directors:
1. Receive and file General Manager’s 2013 performance goals and District
achievements;
2. Direct President Ferryman to negotiate an annual salary adjustment for the
General Manager;
3. Develop 2014 performance goals for the General Manager; and
4. Report back to the Board on July 24, 2014 with the General Manager’s 2014
performance goals and proposed salary adjustment.
Analysis
Below are the performance goals assigned to me in 2013.
1. Refine the District’s Computerized Maintenance Management System (CMMS) to allow
for the tracking of performance measurements of the sewer maintenance division.
Complete: A total of 24 performance measure indicators were developed that
included measuring the division’s workload, efficiency and effectiveness. On
Board of Directors
June 26, 2014
Page 2 of 8
March 6, 2013, I met with Ramon Gallegos, GIS/CMMS Supervisor for
Environmental Engineering & Contracting, Inc. (EEC) to discuss integrating
performance measurements into CMMS. In September 2013, Mr. Gallegos met
with Steve Cano, Maintenance Supervisor on training him how to track
performance measurements in CMMS. Data is being retrieved and recorded into
the CMMS in which staff will be using this information to enhance the level of
service.
2. Explore more opportunities for shared services with other public agencies.
The District has access to the City of Costa Mesa’s Permit Plus software that
gives staff access to the City’s permit files. The software helps District staff
determine when projects are moving forward or if they are delayed. Having
access to the Permit Plus software improves efficiencies because the District
does not have to rely on City staff to meet our request.
On May 13, 2013, the District used Irvine Ranch Water District’s CCTV crew to
determine if CMSD’s sewer mainline caused a sinkhole on Flower Street. A letter
of appreciation was sent to IRWD’s GM for their assistance and to recognize the
shared service success story. This success story was also sent to LAFCO.
3. Partner with OC Goodwill on holding a community event for collecting donated items
that are reusable.
Complete. On Saturday, October 26, 2013, the District partnered with Orange
Coast College (OCC) and OC Goodwill to sponsor a special event that provided
residents with an easy and convenient method for recycling unwanted clothes,
furniture, E-waste and other items. Paper shredding was also made available to
residents. A total of 186 donors attended the event that filled 27.25 cages. OC
Goodwill determines a successful donation event occurs when 18 cages are
filled. A total of 20,913 pounds of donated items were collected and diverted
from the landfill. The results of this event were presented to the Board on
November 12, 2013 during a study session.
4. Implement the District’s private pumping station assessment program and report back
to the Board the results of the program.
Not complete due to unforeseen circumstances. The District’s dedicated pump
station maintenance worker was released from employment. The District had to
Board of Directors
June 17, 2014
Page 3 of 8
train another staff person to become the dedicated pump station maintenance
worker. Before the District can assess private pump stations, District staff
needed more time to gain the required knowledge and skills to effectively assess
private pumping stations.
5. Communicate updates to the Board regarding the Westside Pump Station
Abandonment Project and continue keeping open communications with OCSD.
Complete. On June 18, 2013, staff gave the Operations Committee an oral report
about this project. Staff provided report details and indicated that the total
budget for the project will be ready within 30 to 45 days. On October 15, 2013,
staff gave another updated report regarding this project during a study session.
OCSD staff was in attendant at the study session and provided the Board with the
latest information regarding this project.
6. Work with the Board of Directors and staff on revising the District’s Strategic Plan.
Complete. On April 3, 2013 I facilitated a special Board meeting to discuss ideas
for revising the Strategic Plan. This included revising the District’s Vision
Statement and Core Values along with revising the many goals attributed to the 7
Strategic Elements outlined in the Plan. On May 28, 2013, the Board approved
and ratified the revisions and said Plan is now on the website. This goal was
achieved without the assistance of a consultant, which saved the District
approximately $5,000 to $10,000.
7. Survey the SLAP program participants concerning their experience with the program.
Complete. At the August 20, 2013 Study Session staff presented the SLAP
survey results to the Board. 58 SLAP participants were surveyed. The result of
their experience is as follows:
• 86% of participants believe their sewer lateral is in safer condition to
prevent SSOs.
• 96% of participants indicated that staff operated in a professional and
courteous manner.
• 76% of participants indicated the District was able to discuss and
assist on their sewer lateral problems.
• 92% of participants support continuing SLAP.
Board of Directors
June 26, 2014
Page 4 of 8
• 84% of participants are aware that “wipes” and other “flushable”
products cause sewer backups.
• 83% of participants are satisfied with their contractor’s performance.
8. Analyze the practical number of hotspots and then report to the Board.
Complete. At the July 31, 2013 Board of Directors regular meeting, I presented a
staff report that included staff findings regarding the practical number of sewer
hotspots within CMSD service area. I concluded that 9 to 11 hotspot locations is
practical because structural hot spots (e.g. sags) are more difficult to remove
due to repair costs and FOG will continue in sewer pipes at high density
residential locations such as Hamilton Street.
9. Develop a five year summary report for the SLAP program achievements.
Complete. A five year analysis was presented to the Board during a study
session on October 15, 2013.
10. Evaluate developing a means of using the CCTV data to identify the sewer laterals that
had major roots and coordinate by parcel home addresses so the District can chose to
contact the home owner.
Complete. On November 12, 2013, staff presented to the Board a plan for
evaluating tree roots in private sewer laterals using CCTV data. Of nearly 75,000
CCTV observation, staff was able to identify 2,900 observations had roots in
laterals. Staff will upload still pictures for each observation to identify laterals
with extremely heavy root infestation. When those laterals are identified staff
will match the APN with the addresses on file at the District. Letters will be
mailed to homeowners notifying them of the observations regarding tree roots in
their laterals and to inform homeowner about the District’s Sewer Lateral
Assistance Program. Mailing 2,900 letters will cost the District nearly $1,400 in
postage. Additional costs will incur from staff stuffing envelopes. Therefore,
staff will implement phases for mailing 2,900 letters by mailing 725 letters a year
for four years. Staff will also cross reference SLAP applications with the 2,900
letters to determine if residents adhere to District’s advice.
11. Develop a plan/schedule to meet the 2020 state mandated 75% diversion requirement
with a timeline of events.
Board of Directors
June 17, 2014
Page 5 of 8
Complete. On April 10, 2013 the Board of Directors held a special meeting to
develop zero waste goals. The Board adopted a goal of achieving 75% diversion
by 2015 and 90% by 2020. On November 21, 2013 the Board considered
implementing an organics recycling program by using CR&R’s anaerobic
digestion system, but before a decision was made the Board directed staff to
obtain feedback from the public. Several town hall meetings were held including
one on December 17, 2013. The organics recycling program was approved and
will begin in January 2015. Later that year the District will be diverting 75% of
residential waste stream from the landfill.
12. Continue to educate the Plumbers on the SLAP program.
Complete. On Thursday, October 17, 2013, the District hosted a SLAP seminar
for local plumbers. Staff mailed approximately 99 letters to local plumbers and
the District solicited assistance from the Plumbing Heating Cooling Contractors
Association by having them notify their Orange County members about the
seminar. A total of 12 plumbers attended the seminar and now these plumbers
will be added to the District’s list of approved SLAP plumbers.
13. Prepare a summary of the cost savings the District experienced in the last three years.
Post that information on the District’s website.
Complete. At the September 9, 2013 Study Session, I presented to the Board
District cost savings in the last three years. I estimate that the District has saved
$2,344,252 in the last three years. The savings comes from using trenchless
technology for sewer rehabilitation, pension reform, paperless agenda program,
reduced trash tonnage and other related programs. This information was posted
in the website.
14. Develop an odor control plan noting areas with historical odor complaints and a list of
projects to mitigate the odors. Summarize as part of the plan the impact of
downspouts.
Complete. A plan was presented to the Board of Directors at your regular Board
meeting on October 24, 2013. The following is the plan presented to the Board.
• Wet wells are cleaned annually and washed down when necessary. Also,
the Flygt pumps allow the water level to be pumped down by an operator
to nearly the bottom of the well (“snored”) causing mixing of the
Board of Directors
June 26, 2014
Page 6 of 8
remaining water and anything remaining. This prevents grit and solids
from accumulating at the bottom of the wet well.
• Odor blocks (deodorizers) are placed inside wet wells.
• If lift stations are continually experiencing high levels of H2S (averaging
higher than 1.0 ppm per day) then staff will conduct a cost analysis to
install down spouts versus applying chemicals in the wet well or using
other methods such as air scrubber systems, wet well aeration, etc.
15. Develop a plan for the six pump station abandonment with the logical projects and
provide an Engineer’s estimate of cost for each project and/or a schedule for when the
projects and cost will be available.
Complete. At the October 15, 2013 Study Session, staff presented to the Board
an updated Engineer’s estimate for Project #101, Westside Pumping Station
Abandonment. Total project cost, including contingency, contract
administration and inspection is $4,613,485. When the project is completed
(March 2019), staff estimate the District will save approximately $50,465 annually
in maintenance and repair costs and $15.6 million in capital and electrical costs
over the next 50 years. Staff also presented to the Board alternatives to keeping
Canyon Pump Station because of the depth for the new gravity sewer line.
16. Develop a comparison chart of the Director’s or council person’s pay and benefits for
CMSD, Mesa Water and the City.
Complete. In a November 1, 2013 internal report, I presented to the Board an
analysis of the salary and benefits elected officials are receiving from CMSD,
Mesa Water and the City of Costa Mesa.
17. Report quarterly on the Idea Program to the Operations Committee.
Complete. Staff presented reports to the Operations Committee on June 18,
2013 and to the Board Study Session on September 9 and December 17, 2013. A
total 9 ideas were approved by the Board in 2013 totaling $3,989 in monetary
rewards that resulted in a total savings of $97,428.
18. Continue to decrease the SSOs to meet the SARWQCB agency average with SSOs
from pump stations.
Board of Directors
June 17, 2014
Page 7 of 8
Complete. The District had 2 SSO’s in 2013, the fewest SSO’s in its history.
However, one of the two SSO’s experienced the largest spill volume (75,000
gallons) in the District’s history.
19. Analyze the impact of the loss of Garcia recycling on the residential trash tonnage.
Complete. Staff analyzed the impact of the loss of Garcia recycling and
presented their findings to the Board at your October 15, 2013 Study Session.
Though not conclusive, the data obtained by staff showed that when Garcia
closed on February 14, 2011, the recycling volume at OCC decreased in 2012
while the recycling volume increased for CMSD in 2012. Staff believes the
volume increased at CMSD because fewer people removed recyclables from
residential trash can due limited buy-back centers.
20. Prepare an analysis that compares lining a pipe or force main with dig and replace.
Complete. On August 29, 2013, I presented to the Board at your regular Board of
Directors meeting an analysis that compared the cost to perform the traditional
method of digging and replacing dilapidated sewer pipes versus modern
methods of using trenchless technologies. I concluded that trenchless
technology is a proven and cost effective method to rehabilitating sewer
systems. If the conditions are right, CMSD will use one of the many trenchless
technologies identified in the staff report. However, there are times when
replacement needs to, and should be considered. For example, relining does not
repair significant sags.
21. Expand the door-to-door household hazardous waste collection program to senior and
disabled residents.
Complete. In 2012, CMSD had 4 HHW collections (two from WM Curbside and
two from CR&R). In 2013, CMSD had 43 HHW collections to seniors and disabled
residents. All 43 collections were made by CR&R.
Strategic Plan Element & Goal
This item complies with the objective and strategy of Strategic Element 6.0.,
Personnel/Organizational Management, which states:
“Objective: To employ and retain a high quality, motivated workforce.”
Board of Directors
June 26, 2014
Page 8 of 8
“Strategy: We will do this by utilizing sound policies and personnel practices, offering
competitive compensation and benefits, providing opportunities for training, development
and professional growth, while ensuring a safe and secure workplace.”
Legal Review
Not applicable at this time. However, if the Board is considering a salary adjustment for
the general manager, District Counsel will prepare an amendment to the general
manager’s contract and will presented amendment to the Board for approval
consideration.
Environmental Review
The General Manager’s performance goals are not a disturbance of the environment
similar to grading or construction and are not a project under CEQA or the District’s CEQA
Guidelines.
Financial Review
Not applicable at this time.
Public Notice Process
Copies of this report are on file and will be included with the entire agenda packet for the
June 26, 2014 Board of Directors regular meeting at District Headquarters and on the
District’s website.
Alternative Actions
1. Refer the matter back to staff.
Attachment A: 2013 CMSD Achievements
Successfully streamlined Board
meeting videos on District
website.
Acquired a new utility truck
with crane.
Successfully conducted Sewer
Lateral Assistance Program
seminar to local plumbers.
Successfully scanned and elec-
tronically archived nearly
3,000 pages of sewer plans.
Fewest number of Sanitary
Sewer Overflows (SSO) in
District history. There were
two SSO’s in 2013.
Conducted a successful Or-
ganics Recycling workshop.
General Manager of the Year
presented by California Special
Districts Association.
Vice President Michael
Scheafer elected to Special
Districts Risk Management
Authority Board of Directors
Lowered solid waste rates for
the second consecutive year.
Successfully adjusted liquid
waste rates to reflect equity
among all classes.
Zero lost days from work due
to work related injuries.
Created standards for qualified
list of contractors.
Designed and launched new
website.
Partnered with Discovery
Science Center for the Eco
Challenge Education Program
to 6th Graders.
2012 Collection System of the
Year presented by California
Water Environment Associa-
tion (CWEA).
2012 Collection System of the
Year presented by Santa Ana
River Basin Section of CWEA.
Successfully conducted Prop
218 public hearing for sewer
rate adjustments.
General Manager gave presen-
tation about CMSD’s achieve-
ments to OC LAFCO. Com-
mission
Partnered with South Coast
Plaza management to reduce
hydrogen sulfide levels within
sewer system.
Successfully completed an
internal audit of the District’s
Sewer System Management
Plan (SSMP).
Successfully completed
Knowledge Transfer Program.
Recipient for District Trans-
parency Certificate of Excel-
lence presented by the Special
District Leadership Founda-
tion.
Successfully revised the Dis-
trict’s Strategic Plan.
General Manager was the
keynote speaker at the Costa
Mesa Chamber of Commerce
“90 Minute Breakfast Boost”.
Completed performance audit
of CR&R Environmental Ser-
vices
Successfully created and
implemented the District’s
first Wellness Program.
Successfully implemented an
Alkaline Battery Recycling Pilot
Program to replace the Tele-
phone Book Recycling Pro-
gram as a fundraising event for
local schools.
Board of Directors completed
CSDA’s Leadership Academy.
Partnered with OC Goodwill
and OCC to hold the com-
munity’s first annual used item
collection event.
Significant Accomplishments
COSTA MESA
SANITARY DISTRICT 2013 Accomplishments
“Whether you think
you can or wheth-
er you think you
can’t, you’re right.”
Henry Ford
American Industrial-
ist
Administration
Adopted Ordinance No. 97 pertaining to District records and adopting Resolution
No. 2013-827 establishing a new records retention schedule.
Adopted Ordinance No. 98 establishing plumbing fixture fee credits.
Approved nine staff ideas from the District’s Rewarding Ideas Program that saved
the District $97,428 annually and improved District operations.
Amended and ratified the 2010-15 Strategic Plan to include a new vision and core
values statement along with new goals to achieve.
Adopted Administrative Regulation No. 60.00 establishing the Public Records Act
Request policy and procedures to facilitate accessibility of information to mem-
bers of the public.
Adopted California Environment Quality Act (CEQA) Guidelines.
Adopted revised Standby Policy to ensure equitable distribution of work among
the four District field staff.
Dissolved Operations Committee and instituted Board study session meetings.
Finance
Successfully adopted a two year budget for the first time. Total budget amount
for two years is $21,655,800.
District’s unfunded pension liability is only $201,337.
Lowered the sold waste assessment for the second consecutive year.
Successfully adjusted the liquid waste assessments to ensure equity in all classes.
Approved eConnect Direct Licensing Agreement that allows District Treasurer
electronic access to markets when making investment decisions.
Successfully completed Comprehensive Annual Financial Report (CAFR) for fiscal
year ending June 30, 2012.
2013 Accomplishments
“Winning is a hab-
it. Unfortunately,
so is losing."
-- Vince Lombardi,
American football
player and coach
PAGE 2
Liquid Waste (Sewers)
Successfully replaced section of 37-year piping and valves in Elden Pumping Sta-
tion and installed a second downspout to reduce hydrogen sulfide levels.
Accepted improvements for Project #192—System Wide Sewer Reconstruction—
Phase 2 where 91 sewer pipe sections were rehabilitated. Cost: $184,675
Successfully completed Sewer System Management Plan (SSMP) self audit.
Developed an Odor Control Plan to minimize, reduce and/or eliminate hydrogen
sulfide levels from pump stations.
Installed additional smart covers at six pump stations to serve as a second and
sometimes third independent high water alarm system.
Approved agreement for pump station maintenance and repair work at eleven
pump stations. Cost: $169,182.82.
Created coloring tri-fold for children ages 5 to 10 years of age and the creation of
the “Sewer Slayer”.
Successfully anchored all 20 pump station electrical enclosures to meet current
seismic requirements and to prevent from tipping over during an earthquake.
Acquired new crane truck that will allow staff to pull any size pumps from sewer
wet wells.
Successfully completed force main analysis at Victoria, Mendoza, Harbor and
South Coast Plaza
The maintenance crew successfully cleaned 347,765 feet of sewer mainline while
at the same time, the District’s contractor, NPS, cleaned 385,648 feet to prevent
sanitary sewer overflows. A total of 733,413 feet of mainline was cleaned in 2013.
Approved a manhole cover maintenance program where the District will evaluate
it’s manhole cover inventory to determine the number of manhole covers that
need immediate repair.
Successfully reduced hot spot locations to 41 from the original 95 locations.
2013 Accomplishments
“A good leader
takes a little more
than his share of
the blame, a little
less than his
share of the cred-
it."
-- Arnold Glasow,
American busi-
nessman and
writer
PAGE 3
Solid Waste
Successfully completed a performance audit of CR&R Environmental Services.
Adopted a Zero Waste goal of achieving 75% diversion by 2015 and 90% by 2020.
Reduced rates for the second consecutive year to $18.00 a month.
Successfully negotiated 2nd Amendment to exclusive franchise agreement with
CR&R Environmental Services that included an Organics Recycling Program and
reducing operational and disposal costs.
Collected and recycled the most Christmas trees in three years. A total of 5,581
Christmas trees, or 86 tons, of green waste was diverted from landfills.
Sponsored the MUZEO Trash Art Challenge that encouraged students to create
art by using trash products.
Successfully received a grant from CalRecycle to purchase over 2,000 Sharp con-
tainers to safely dispose of needles and other sharp products.
Implemented an Alkaline Battery Recycling Pilot Program as an alternative to the
Telephone Book Recycling Program that will allow students to raise money for
their schools.
Sold approximately 316 composting bins, 67 vermicomposting bins and scheduled
32 free workshops.
Successfully coordinated the District’s first donation event with OC Goodwill at
Orange Coast College where 27 cages of donated items were collected.
Nearly 400 Costa Mesa students participated in the Eco Challenge Program from
the Discovery Science Center.
Mailed brochure about helpful tips to promoting source reduction at schools to
28 schools in Costa Mesa.
New signs were placed on CR&R refuse trucks that reads, “Costa Mesa Sanitary
District Recycles for You”, and a second interchangeable sign about CMSD pro-
grams is placed underneath the first sign.
2013 Accomplishments
“No effort that we
make to attain
something beauti-
ful is ever lost."
-- Helen Keller,
American author
and activist
PAGE 4
Capital Improvements
Project #196A—Awarded contract to install emergency backup power and pump-
ing capability at six critical lift stations. Contract amount—$485,200.
Project #197 — Awarded contract to complete System Wide Sewer Reconstruc-
tion, Phase III in the amount of $228,700. At the completion of this project all
255 Grade 5 sewer deficiencies will have been reconstructed.
Project #201— the Board approved the rehabilitation method of four force mains
(Harbor, Mendoza, South Coast Plaza and Victoria) that includes no dig technolo-
gy (directional drilling) and traditional remove and replace. Total estimated
cost: $790,250.
Replaced electrical enclosures at Santa Ana and Harbor Pump Stations with stain-
less steel enclosures. Cost: $17,790.
Awards & Employee Achievements
Collection System of the Year, California Water Environment Association (CWEA).
Collection System of the Year, Santa Ana River Basin Section of CWEA.
Transparency Certificate of Excellence, Special Districts Leadership Foundation
(SDLF)
Operating Budget Meritorious Award, California Society of Municipal Finance
Officer
General Manager of the Year, California Special Districts Association
Dyana Wick, CMSD Employee of the Year
Steve Cano achieved Grade 3 Collection System Maintenance Certification from
CWEA.
Alex Arreola successfully obtained a commercial drivers license (Class B).
2013 Accomplishments
“Courage is being
scared to death
and saddling up
anyway."
-- John Wayne,
American actor
PAGE 5
Awards & Employee Achievements
General Manager achieved Certified Special District Administrator status from
SDLF
Alex Arreola achieved Grade 1 Collection System Maintenance Certification from
CWEA.
Joel Ortiz, CMSD Safety Person of the Year.
Good Media Coverage
Sanitary District recognized for transparency, Daily Pilot, June 21, 2013
Costa Mesa sewer, trash rates change, OC Register, July 2, 2013
Sanitation District honored, Daily Pilot, September 26, 2013
Donations will help OCC, Daily Pilot, October 21, 2013
Composting converts, Daily Pilot, October 24, 2013
Costa Mesa homes could get organic waste bins, OC Register, November 21, 2013
Organics collection picking up steam, Daily Pilot, November 22, 2013
Christmas tree pick-up schedule, details, OC Register, December 29, 2013
VISION Statement
“Promoting a sustainable environment that is free from
sewer and solid waste pollution.”
2013 Accomplishments
“The world hates
change, yet it is
the only thing that
has brought pro-
gress."
-- Charles Ketter-
ing,
American inventor
PAGE 6