Loading...
Proposal - Robert Thornton Architects Inc. - 2014-03-11 RWO EVISEDORKRDER Client Name:Robert Thornton Architects, Inc. Date: 3/11/14 Attn:OMB Job No.:14078.00 Robert Thornton Phone No.:Client No.: (949) 650-9876 1200 Fax No.:Client Job/P.O. No.: (949) 215-5927 Project Name: Costa Mesa Sanitary District - Generator Addition Project Location: Costa Mesa, CA Scope of Work: Provide electrical engineering services to prepare electrical construction documents to add a Diesel driven generator to back-up the entire facility scope to include construction administration services. Provide for 3 site meetings / surveys through-out duration of project. Fee:Compensation shall be based on the following lump sum fixed fee: Site Meeting / Survey: 3 Included: $ 900.00 Construction Documents: $ 3,600.00 Total: Lump Sum: $ 4,500.00 Reimbursable expenses are at OMB cost plus 10%. Reimbursables: Current Hourly Rates: For Office Use Only Principal $170.00 Designer $100.00 DBAC Lighting Designer $160.00 BIM / Revit $ 90.00 NJPC Project Engineer $150.00 CAD Drafting $ 80.00 Sr. Designer $125.00 Clerical $ 60.00 Submitted by: Accepted by: Dennis E. McVay, Principal OMB PM: Company Name: Martin O. Gilchrist, Project Manager Date:Date: March 11, 2014 OMB's total liability to client/owner due to professional negligent acts, errors or omissions shall be limited to $50,000.00. THIS WORK ORDER WILL BE ASSUMED CORRECT AND BINDING UNLESS OMB IS NOTIFIED OTHERWISE IN WRITING (BY FAX OR MAIL) WITHIN 5 WORKING DAYS OF DATE OF WORK ORDER 10408-R.sp.O01