Loading...
Bid Proposal - Avram Electric - 2013-11-056954 COTTONWOOD CIRCLE CORONA, CA 92880 TEL: (951) 9664774 FAX: (951) 272-4190 LIC# C10- 906069 PROPOSAL To: Costa Mesa Sanitary District Description: #196 -B Canyon Pumping Station Generator We are pleased to submit our proposal for the above referenced project based on plans, specifications, addendum 1 and 2. Acknowledgement of: Addendum l- 10/15/2013 Addendum 2- 10/26/2013. Subcontractor: TSR Construction and Inspection Inc. 8264 Avenida Leon Rancho Cucamonga, CA 91730 Lie# 881123/A,B Total: $64,815.00 ( sixty four thousand eight hundred fifteen dollars). Gheorghe Avram/ Owner Avram Electric 11/05/2013 i ADDENDUM NO. 1 Contract Documents and Construction Plans CMSD p 196 -B CANYON PUMPING STATION GENERATOR Today's Date: October 15, 2013 Bid Opening Date: November 5, 2013, 10:00 AM This Addendum is hereby made a part of the contract documents and construction drawings. Receipt of the Addendum shall be noted in the Bidder's proposal. The following changes, additions, clarifications or modifications shall be made to the contract documents and construction drawings; al l other conditions remain the same. Bidders shall possess a "C -10" and `B" license for the electrical installation, construction of retaining wall, sawcutting, trenching, installing conduits, and removing and replacing paving. An "A" License is required for one small area of public sidewalk replacement. Also, District will accept a Caterpillar, Cummins, Kohler, or equal, generator. If there are any questions, please call (949) 631 -1731 office or (714) 293 -2727 cell. "Thank you. COSTA MESA SANITARY DISTRICT I Robin B. Harriers, PE District Engineer iorI ADDENDUM NO.2 196 -B Canyon Pump Station Generator Today's Date: October 26, 2013 Bid Opening Date: November 5, 2013, 10:00 a.m. This Addendum is hereby made a part of the contract documents and receipt of the Addendum shall be noted in the Bidder's proposal. The following changes, additions, clarifications or modifications shall be made to the contract documents and all other conditions remain the same. Bidder to incorporate the following revisions and additions: The bollards protecting the front of the generator shall be removable and furnished with locking devices. 2. Bidders to include a gate along the front side of the block wall enclosure. Gate to be secured to sidewalls and open wide enough not to encumber maintenance. Fencing material to be equal to Caltrans Chain Link Fence Stds. A85 and A85A or as approved by District. 3. Generator and retaining wall will be moved approximately 3 feet closer to Canyon Drive to avoid impacting the roots of the existing large tree. If there are any questions regarding this addendum, please call (949) 631 -1731 office or (714) 293 -2727 cell. Thank you. COSTA MESA SANITARY DISTRICT Rob Hamers, PE District Engineer I of