S-68-2.1i
PART SCHEDULE
Modification Number
A
B
C
D
E
F
G
H
a
K
/O P/anged Tee
6x6 x6"
6xG!rG"
®K8 "x6"
8x6"x6"
4'k4 x4'
gkg "x6"
8 "K6k6"
/2 "x 12'X6"
6'$c6 "W
818'k6"
2O Gate KzAm, Flanged, N.R.S.
6"
6"
!!'
8"
4"
8"
9"
t2"
6"
8"
OGate Valve, Flanged, N.R.S.
6-
6"
'i6 "'}
6"
4"
6°
6"
6"
G.
6-
O Short Length Flanged Pipe
6"
6
IS-
6"
NOTES
'All sewer construction shall conform to the standards
)--� of the Costa Mesa Sani terry District and shall be
completed to the satisfoction of the Distrkt ErVineer.
� The existence and location of any underground utility %r Pipes or Structures shown an these Plans are obtained
by a search of the available records. To the best of
/i our knowledge there ore no existing utilities excrrpt
as shown an these plans.
The contractor is required to take due precaufIbnary
r measures to protect the utility /roes shown and any
TP A CT JI N- I I � � other lines not of record or not shown on these
t,P.I plans.
LOT /89 j LOT
REVISED AM* /969
ADDED SK -PASS K
DELETED 8Y -PASS c
tj
,) 11 trA. IF
L =4 -A COSTA MESA SANITARY D ISTR ICT
L Q T 2: ! SCALEtio -Z.O'
BY -PASS CONNECTIONS FOR
SEWAGE PUMP STAT/oIVS
IN COSTA MESA, CALIFORNIA
APPROVED � ^ AT --Zlse -46
DONALD E.STEV./ 66
r^\ D ISTRICT ENG/NErER
obfoin Permif f)-om Criy olrCasfo Mesa. J ` DATE ✓oB NO. SHEET No.
NOVEMBER, 1968 1 949 1 / OIc /