General Notes for Grading Offsite/Street Improvement Plan
1. All work and materials within the public right -of -way shall conform to
the City of Costa Mesa Standard& The Conditions of Approval as approved
on, December 1997, and shall meet the approval of tin City Engineer.
2. AN work shall be performed and all materids shall be In accordant*
with City of Costo Mesa Standard Drawings and the Standard Specifications
for Public Works Construction. (Green Book) current edition.
3. Contractor shall furnish and install all signs, lights. barricades,
flashing arrow board and any other traffic control of warning devices,
including flogmen, as may be required by the City Engineer. All items
mentioned shall be In conformance with the current requirements as
specified M the latest edition of the "Construction Safety Orden," and
W.A.T.C.H. Failure to do so will be cited under applicable section of the
C.V.C. and corrective costs to the City will be charged.
4. Contractor shall obtain Engineering Division excavation and Sit*
Access permits prior to start of any an or off -site constructions in
public right -of -way and request inspection from City Engineering Division
24 hours in advance of performing any work. Telephone (714) 754 -5323. The
Contractor shall maintain a copy of permits and signed plans on the job
site.
5. Permits will be required from the Mew Consolidated Water District,
Orange County Sanitation District, and Costs Mesa Sanitary District for
construction of water and sewer improvement& The contractor shall notify,
each 48 hours prix to beginning construction.
S. Geologic and /or Sons Reports prepared by PETRA and dated December 29, 1997,
have been reviewed and approved by the Building Official including all
supplements, addenda, and amendments thereto are included by reference.
Copies of these reports are an file at All recommendations contained
therein must be followed.
7. Estimated quantity of out . Estimated quantity of fit . (For plan
check and permit fee purposes only, not for bid or payment)
8. The Controctor shall pay for the Initial soil and materide tests and
any subsequent soil and materials tests deemed necessary, irk a to the
failure of the initial tests, as determined by the City Engineer.
9. Pavement and base thickness as shown are based an a preliminary "R'
value. During construction a soils test shall be made to determine the
actual 'R" value and the thickness will be adjusted accordingly. Teets
shall be mat. by a licensed Sass Engineer and approved by the City
Engineer-
10. Parkway trees will be planted and iigation lines Installed
indudinq riser& heads, valves, and meters as directed and in accordance
with the requirements of the City of Costa Mow Deportment of Leisure
Services.
11. Locate and protect all existing utlRies in plea& Submit
notification letter clang with plans to Southern California Edlem
Pacific Bell, and Southern Ca famh Gee Company prior to oppevsA of
plan.
12. M construction staking sisal be done by a licensed engines► and
certified in writing as to Hine and grads Per app plan all submltte0
to the City Engineer.
13. No work shall be done an adjacent propertas or adjacent ownsrts
improvements without obtaining written permission from on owners of the
adjacent properties, and submitting a copy thereof to City Engineering
Division and Building Deportment
14. Waft, once began. shall be prosecuted to completion without delay so
as to provide minimurn Incas v*nkwrce to adjecent property owners and the
traveling public
15. ALL STREET STATIONING REFERS TO THE CENTERUK OF THE STREET AND CURB
DATA REFERS TO THE FACE OF CURB.
16. The amount of asphalt binder to be mixed with the mined aggregate
shall be 5.6 percent by dry weight
417. All underground work shall be complete prix to any surface
work in the public right -of -way
18. When driveway depressions are constructed, the driveway approaches
shall be constructed to property line per City of Costa Mesa Standard
Plans. Location, type and width are to be approved by the City
Transportation Manager.
19. Crush miscellaneous base may be used under wake and curb and gutter
in lieu of crushed aggregate bas&
Im F F - S 10001E
Notes for Grading Offsite/Street Improvement Plan (Can't)
20. Any lot comer of OCEMA BM, monument. or tie destroyed or displaced
shall be restored to its original position by a licensed engineer or
surveyor. Any change In location or elevation shall be reported to the
City Engineer and OCEMA by a licensed engineer or land surveyor on 8 I/2'
x 11" paper (one side only) showing location and ties or level run.
21. AN existing drainage courses on the project must continue to
function, especially during storm conditions, and approved protective
measures and temporary drainage provisions must be used to protect
adjoining properties during the grading project. In dl cases, the
Contractor aid /or developer shall be held liable for any damage der to
obstruction of natural drainage patterns. If the foregoing cannot be
complied with, a fully executed, notarized, and recorded agreement
between the affected parties will be effected.
22 All haul routes must be approved by the Manager of Transportation
Services.
23. The project site shall be maintained in a 'wet -down' conditign to the
degree necessary to prevent excessive dust Periodically, spillage and
dust shall be removed from the public right -of -way by sweeping or
sprinkling; however, watering, that results in mud an public streets is
not permitted as a substitute for other doming methods.
24. All utility trench backfill, material, and compaction shall conform
to CCM Standard No. 813. Bore under existing improvements - tunnefling to
not allowed No open excavations will be allowed overnight badxfll or
plate.
25-Ai PCC and AC to be joined shall be saw wt In a dean, straight line
as approved by the City Engineer.
25. All obstructions, within the public oldewdIt such as power hales,
streetlights, fin hydrants, utility pedestals, mailboxes, and street
signs shall have minknum of 4 of dew sidewalk placed behind then.
27. "As Butt' drawings shall be submitted to the City Engineering
Divi" upon completion of Improvements as shown on the approved plan&
28. All storm drain work and materials shall conform to the OCEMA.
LACFCD, and the City of Costa Mesa Standard Pans and meet the approval
of the City Engineer.
30. All storm drop manholes .hat be left below ekbgrod& The Contractor
sled also the manhole francs and covers to finished grade and make
necessary repairs to the pavement
V
(IMPROVEMENT
STREET AIN
SIEWER WATER STORM DRStandard Water Constriiction Notes
'If
CONSTRUCTION NOTES
Is
VICINITY MAP SOLS EMNEM
ROADWAY
BENCHMARK DESCRIPTION HB 245 77
1
REMOVE EXISTING CURB& GUTTER BY SAWCUTTING JOIN BETWEEN
GUTTER AND A.C., REPLACE A (MIN) OF 3' FEET OF A.C. ADJACENT
TO THE GUTTER. THE NEW STRUCTUAL SECTION SHALL BE 6" A.C,
OVER 6" CMB.
300
SF
2
CONTT. -' A.C. OVER _' A.B. PER SOILS REPORT)
1,100
SF
3
1 REMOVE EX C&G & REPLACE WITH PCC 8 CURB & GUTTER TYPE -C-8- PER CITY OF COSTA MESA SM. DWG. NO. 312 OVER 6 MIN CM .
54
LF
-
4
CONTT. TYP. CROSS GUTTER PER CITY OF COSTA MESA STD. DWG. NO. 415
188
SF
5
CONTT. CURB RAMP PER CITY OF COSTA MESA STD. DWG. 416 CASE PER PLAN
2
EA
6
REMOVE EX SW R REPLACE WITH 4" PCC SIDEWALK PER CITY OF COSTA MESA STD. DWG. NO. 411 OVER 4 MIN CMB
7,780
SF
7
TRENCH REPLACEMENT PER C.C.M. STD. N0. 13
100
LF
STORM DRAIN
W W
TC -
10
ICONST. JUNCTION STRUCTURE
1
EA
11
COSTT. 24' RCP 1500D
44
LF
HP -HIGH
WATER
LP
12
CONTT. 8" PVC C 150 C900 AWWA WHITE WATERLINE
18
LF
13
CONTT. 6' PVC CL 150 C900 AWWA WHITE WATERLINE
23
LF
14
COSTT. 12'x8' TAPPING SLEEVE AND 8' R.S. GATE VALVE, FLG.xGT. PER MESA CONSOLIDATED WATER DIST. STD. DWG. NO. 6
1
EA
15
INSTALL 8x6 GT.xFLG. REDUCER
1
EA
16
INSTALL GT.xFLG. 45' ELL
3
EA
17
CONTT. THRUST BLOCK PER MESA CONSOLIDATED WATER DIST. STD. DWG. NO. 12
3
EA
18
RELOCATE EXISTING FIRE HYDRANT k INSTALL PER PER I . NO. 4
1
EA
SEWER
19
CONTT. 48" MANHOLE PER CMSD STD. DWG. S -100
1
EA
20
COSTT. 8w V.C.P. SEWER MAIN W BEDDING PER CMSD SiD. DWG. S -112
27
LF
VICINITY MAP SOLS EMNEM
LEGEND
BENCHMARK DESCRIPTION HB 245 77
PEITA O
ON THE NORTH SIDE OF ADAMS AVENUE, 0.5 MILE WEST OF HARBOR P
P i
818&A AMWAY AVE T
THE NORTH SIDE OF THE STREET; 1 FOOT BACK OF FACE OF CURB; 1
151 DRAVE !C C, ZSUrrE C
- -��
RIGHT -OF -WAY
-
- --
CENTERUNE
PROPOSED CURB
-
-
EXISTING CURB
rant
CATCH BASIN
18" SD-
STORM DRAIN
rp
SEWER
WATER
W W
TC -
TOP OF CURB
FL -
FLOW LINE
FS -FINISH
SURFACE
HP -HIGH
POINT
DATE OF CONSTRUCTION
BEG.
END
BASIS OF BEARING
APPROVED BY:
CITY ENGINEER RCE
PLANS
1. Engineering Plan Check epection Fee and Performance ee
be paid and Appllcc=/Permit 17 )Fee
completed by the applicant prior to
the approval of the pans and issuance of the A.P. Fees shah be in
accordance with District rates and deposit schedule.
2. Development Impact Fees shall be collected by the District at the time other
fees we collected prior to approval of plans or eerdce agreement,
whkhsver is first This fee shill be In accordance with District rates and
deposit seheduls.
3. Mater mains will be installed according to the latest Standards and
Specifications of the HCUD.
4. Contractor to have, an the job site, a copy of the latest Standard
Specifications at all times.,
5. Contractor to notify MCUD 48 hours prior to construction (Phone
714- 631 -1291 - Inspection Department).
6. A cash Performance Guarantee Bond shill be held one year after MCUD's Notice
of Completion to guarantee work performed by the Contractor.
7. Separation between sanitary sewer and water main* will be tor' HORIZONTAL, 1'
VERTICAL.
8. A 15' water main easement will be granted to the MCWD for maintenance
purposes, 5' for water services (7.5' each aide of main; 2.5' each tide of
service). Easement documents are to be submitted to the District no later
than 30 days after Notice of Completion It filed.
9. Service laterals will be set to grade by Contractor prior to the
installation of water metes and boxes (per MCWD's Standard Drawings jf, /2
and /3).
10. Water meter will not be be Installed nor water tumed an until the back6ow
devices required for the building and irrigation systems have been
insta!H4 tested, approved, and certified. Contact Water Quality at
714 -574 -1031.
11. Protect existing utotiss in place.
12. Notes mall will have 42' mb&wm cover to finish grad&
13. Rai e existing water wall oovere to grade (Per MCUD Standard Di wehq /14).
14. Instil fire hydrant per MCMIG Standard Drawing /4 or per,
15. Install blow -off per HCWO Standard Drawing /e.
16. WATER MAINS MALL BE TESTED AT 225 P.S.I. FOR FOUR HOURS
17. BackfM material in pipe zero wed have a sand equivalent of 30 or
greater.
18. The backfAi above the pipe zone will be compacted par HCWD Standard
Drawing tie. and be in compliance with C.C.M. Standard Drawing 813.
19. Chip 2- "U' in curb fan to identify water service location.
20. Mtall thrust or gravity baab per HCWD District Standard Drawing /Ii or
/12.
21. Cantracto to vwly depth all leaatten of as utyuss pear to
trenching.
22. Contractor to instil temporary tap* for teoting and chlorination pew to
connecting to existing mall,
23. Contractor to return d material rIs aad to WO y rd, except A.C.P..
broken concrete, and native soil,
24. Water motors and boxes to be instased by MCWD but pail for by odes.
25. A reduced prsewx•e principle aesembty will be required an as water metered
services to any condominium unit over two stories or five or more units an
one metered service. Contact Hater Quality at 714 -574 -1031.
26. Irrigation meters will require a reduced pressure principle osmmbl)c
27. In landscaped areas, no trees shall be located in MCWD easement or within
7.5' of any MCUD facility.
I
28. A reduced pressure principle assembly will be ;required on metered water
services to all industrial buildings.
29. A double check detector assembly will be required on fie line services.
30. Firelins services shall not be turned an until the District Engineing
Department has received a letter from the owner, or his authorized agent,
requesting it and stating that the plumbing is ready for the Wine to
be turned on. The letter must also contain the MCUD fie number, size and
send number of the devices and job address.
IMPORTANT NOTICC
SECTION 4216/4217 OF THE GOVERNMENT CODE REQUIRES A DIGALERT
IDENTIFICATION NUMBER BE ISSUED BEFORE A "PERMIT TO EXCAVATE'
WALL BE VALID. FOR YOUR DIGALERT I.D. NUMBER CALL UNDERGROUND
SERVICE ALERT ***TOLL FREE*** 1 -800- 422 -4133 TWO WORKING DAYS
BEFORE YOU DIG.
CITY '- COSTA MESA
EnginiI� Division Approval
For Offs1te Improvements
Engineer Date s' /-I or
NO. PFIEPARM UNDER TM OF
P7314
No. 45591
Fap 12/31/118
OAM Standard Sewer Notes
1. The sewer system shall conform to the standards of the Cosh asses
Sanitary District
2. Contractor ahaN request irhspsetan tram the of fie of the Dis rict
Enq( "W 48 hours prior to carmnerocament of week Telephone (714) *3-
1731.
3. Any work performed without ihspsctam Aam the Dbrble shat be
considered unacceptable.
4. Contractor shag obtain CMSD sewer permit prior to eanwnenewmnt of WIN't
from the Department of Stree ts and Sanitation, Oty of Costa Mesa, 77
Fair Drive. Telephone (714) 754 -5323.
5. Contractor shall obtain as necessary pal ift that may be requll by the
local governing agency.
6. Contractor to have a copy of apps a sewer plen and CM9D Standard PlAm
and Specifications an job site at all time&
7. Clay pipe pints shall be Type '0' mednanl ovl compression joints for main
line sewer. Type 'D" pints, Band -Sod of approved equal. are approved
for laterals and repair work adyt
8. 6" laterals shall be constructed from the sewer main to every lot
9. All laterals shall be placed prior to surfacing of street&
10. Stamp "S' on curb at sewer lateral location&
11. Sewer main shall be air or water tested meeting Diable t Engineer's
approval.
12. Prior to asphalt concrete paving, manhole frames and aavers shas be
left 6' below finish grade. After street surfacing is complete4 ho
and ewe shall M raised to grade per Std. Dag. No. S-105,
13. Sewer manholle Acme and cover shag be Alhambra Foundry A -1270, or
approved equal. Cover to be stamped 'SEWEiC.
14. Sew main sled be based after as manhole Rol bin covers hove bean
mind to grade.
15. PVC pipe may be used a ty with prior approval kem tin Distrat
Engine.
16. If minimum separation distance between sewer all water mdn M not mat,
p ecial construction requi a w to an to bar used per Std. Dwy Ns. S-
ls 17. Developer in responsible for replacing any existing laterals not I=
H field or found to be delecthi L
18. AN bench excavation and pipe bedding shas be done par Std Dwg. Na
S-112.
NOTICE TO CONTRACTOR
Contractor agrees that he shall assume sale and complete responsibility for
job site conditions during the course of construction of this project including -
safety of all persons and property, that these requirements shall apply
continuously and not be limited to normal working hours; and that the
controctor shall defend, indemnify, and hold the vwrmr and engineer harmWft
from any and all liability, real or alleged, in connection with the performance
of work on this project, excepting for liability arising from the sole negligence
of the owner or the engineer.
The existence and location of any underground utility pipes or structures
shown on these plans were obtained by a search of available records. The"
locations are approximate and shall be confirmed in the field by the
contractor, so that any necessary adjustment can be made in alignment and /or
grade of the proposed improvement. The contractor is required to take due
precautionary measures to protect any utility lines shown and any other lines
not of record or not shown on these plans.
IMPROVEMENT PLAN
OFF -SITE STREET, SEWER, WATER
& STORM DRAIN
TRe 15570
CITY OF COSTA MESA
E
EET
OF
1
PLAN
NUMBER
/
I
LEGEND
BOUNDARY
PL
- -��
RIGHT -OF -WAY
-
- --
CENTERUNE
PROPOSED CURB
-
-
EXISTING CURB
rant
CATCH BASIN
18" SD-
STORM DRAIN
rp
SEWER
WATER
W W
TC -
TOP OF CURB
FL -
FLOW LINE
FS -FINISH
SURFACE
HP -HIGH
POINT
LP
-LOW POINT
P -PAD
ELEVATION
FF
- FINISH FLOOR ELEV.
GB
-GRADE BREAK
2R-
RATE/FLOW
J
NOTICE TO CONTRACTOR
Contractor agrees that he shall assume sale and complete responsibility for
job site conditions during the course of construction of this project including -
safety of all persons and property, that these requirements shall apply
continuously and not be limited to normal working hours; and that the
controctor shall defend, indemnify, and hold the vwrmr and engineer harmWft
from any and all liability, real or alleged, in connection with the performance
of work on this project, excepting for liability arising from the sole negligence
of the owner or the engineer.
The existence and location of any underground utility pipes or structures
shown on these plans were obtained by a search of available records. The"
locations are approximate and shall be confirmed in the field by the
contractor, so that any necessary adjustment can be made in alignment and /or
grade of the proposed improvement. The contractor is required to take due
precautionary measures to protect any utility lines shown and any other lines
not of record or not shown on these plans.