Loading...
S-91-4.1COSTA MESA SANITARY DISTRICT PROJECT NO. 1112100 -118 PLANS FOR THE REHABILITATION OF SOUTH COAST PLAZA PUMP STATIONS IN THE CITY OF COSTA MESA NO. ITEM UNIT QUANT. 1. CONSTRUCT PUMPING STATION L. S. 1 �— PROPOSED PUMP STATION NOTICE TO CONTRACTORS LOCATION All contractors and subcontractors performing work shown on or BRISTOL STREET related to these plans shall conduct their operations so that all -- -- _— persons are provided a safe place to work and the public is protected. All contractors and subcontractors shall comply with PARKING the State of California Department of Industrial Relations, w Division of Industrial Safety and Health, "CONSTRUCTION SAFETY D STRUCT. Z ORDERS." The District shall not be responsible in any > way for the contractor's and subcontractor's compliance with al SEARS these orders. I TENANTS MAY CO. Contractor further agrees that he shall assume sole and complete GENERAL NOTES: SEARS responsibility for job site conditions during the course of 1. The sewer system shall conform to the standards of the Costa tz" —_ construction of this project, including safety of all persons and Mesa Sanitary District. PARKING w property; that this requirement shall apply continuously and not SOUTH COAST PLAZA STRUCTURE w be limited to normal working hours; and that the contractor shall 2. Contractor shall request inspection from the office of the 9 District Engineer 48 hours prior to commencement of work. I SHOPPING MALL TENANTS defend, indemnify, and hold the Costa Mesa Sanitary District and (714) 631 -1731. I e" I the District Engineer harmless from any and all liability, real 3. Any work performed without inspection from the District w ID or alleged, in connection with the performance of work on this shall be considered unacceptable. 3 BULLOCKS m 1 project, excepting for liability arising from the sole negligence 4. Contractor shall obtain C.M.S.D. Sewer Permit prior to O 8. o of the Costa Mesa Sanitary District. commencement of work from the Dept. of Streets and v_ 5323ation, City of Costa Mesa, 77 Fair Drive. (714) 754– N J N The existence, approximate location and extent of any underground 5. Contractor shall obtain all necessary permits that may be 15" v utilities or structures shown hereon have been obtained by a required from the local governing agency. Y^ search of the available records. The contractor is required to 6. Contractor to have a copy of approved sewer plan and �o "' take due precautionary measures to protect the utility lines C.M.S.D. Standard Plans and Specifications on job site at BEAR STREET �z shown and any other lines not of record or not shown. If the all times. �N ! contractor, while performing the contract, discovers utility 7. Clay pipe joints shall be Type "G" mechanical compression oZ facilities not shown hereon, he shall immediately notify the joints for main line sewer. Type "D" joints, Band –Seal or Cr District Engineer in writing. approved equal, are approved for laterals and repair work w� only. V) a 8. 6" laterals shall be constructed from the sewer main to every lot. "v 9. All laterals shall be constructed prior to surfacing of streets. 10. Stamp "S" on curb at sewer lateral locations. 11. Sewer main shall be air or water tested meeting District Engineer's approval. LOCATION MAP 12. Prior to asphalt concrete paving, manhole frames and covers TRAFFIC CONTROL NOTES shall be left 6" below finish grade. After street surfacing is completed, frames and covers shall be raised to grade per Contractor to abide by South Coast Plaza requirements for Std. Dwg. No. S -105. working hours and traffic control. Contractor is required to 13. Sewer manhole frame and cover shall be Alhambra Foundry A– submit traffic control plans to South Coast Plaza and 1270, or approved equal. Cover to be stamped 'SEWER'. the District for approval prior to beginning construction. 14. Sewer main shall be balled after all manhole frames and ��FESSIpN Said plans shall include construction schedule , work hours, covers have been raised to grade. Q 9( 15. PVC pipe may be used only with prior approval from the �O \�8• HAM F2 signing, proposed storage areas, and any other information 0 F c District Engineer. � pertinent to the work. ,w p 'A � p 16. Contractor shall be responsible for maintaining warning devices, "' NO m flashing arrow boards, lights and flagmen in accordance with U-1 RCE31120 Contacts: "WORK AREA TRAFFIC CONTROL HANDBOOK" published by Building o; ExP 12/31/92 * South Coast Plaza David Grant (714) 435 -2020 News, Inc., latest edition * Costa Mesa Sanitary District Robin B. Homers (714) 631 -1731 17. Trench backfill material within the limits of the City of Costa Mesa (CCM) J'T C1V\� fit? shall be crushed miscellaneous base or slurry and shall be installed 9TF OF CP��F per CCM Std. 813. Bedding and trench resurfacing shall be per CCM Std. 813. A permit shall be obtained from CCM prior to commencing work. UTILITIES: CALL REVISIONS COSTA MESA SANITARY DISTRICT PROJECT NO. 1112100 -118 SHEET N0. DATE DESCRIPTION ENGINEER: 1 Underground Service Alert REHABILITATION OF 48 hours prior to excavating TT for underground locating. SOUTH COAST PLAZA OF 1 -800- 422 -4133 2 A q1 PUMP STATIONS ROB N B. HAMERS R.C.E. 31720 DATE