S-90-2.1Z 0 0 - ES T I MA TE OF OUANT I T I ESTOTAL PHASEI PHASE Z N9 ITEM UNIT OUANT. OL141 T. aZ141Y7 1 15' 1VCR SEWER L./= 11352.37 476 876.37 2 60// 1.0 MANNOL 5 EA- 7 3 4 3 REMOVE EX /ST. M<WNOLE 0 ✓0/NEX LATERAL EA - 1 / - 4 RECHANNEL MANHOLE BASE EA. 1 / - 5 46 // /0 MANHOLE EA AVENU, MMAI I L (0 e// VGP. SEWER L. F. 21 16 5 7 CUT r PL as EX /ST. Sf ww �PEM0yF E. lrrmfllams L.S. UMP XJ/4 LUMP BI UMP .Q GENERAL NO TES COSTA MESA SAN /TARP DISTRICT PROJECT N° I I 12 100 -102 0 PLAN AND PROFILE FOR SANTA ANA DELHI 1. The sewer system shall conform to the standards of the Costa Mesa Sanitary District. 2. Contractor shall request inspection from the office of the District Engineer 48 hours prior to commencement of work. Tel (714) 6.Y -1731 3. Any ivork performed without inspection from the District shall be considered unocceptab/e. 4. Contractor shall obtain C.M.S.D. sewer permit prior to construction from the Department of Streets and Sanitation, City of Costa Mesa, 77 Fair Drive. Tel (714) 754 -5323. 5 Contractor shall obtain all necessary permits that may be required by the local governing agency. 6 Contractor to have o copy of approved sewer plan and C.MS.D. Standard Plans and Specifications on job site of all times. 7 Clay pipe joints shall be Type "G" mechanical compression joints for main line sewer. Type "D " joints, Band- Seal or approved equal, are approved for lole/aIS and repair work only. 8. 6." laterals shall be constructed from the sewer main to every lot. 9 All laterals shall be placed prior to surfacing of streets. /0. Starrgo "S" on curb at sewer lateral locations. l 1. Sewer main shall be air or water tested meeting District Engineer's approval. 12. Prior to asphalt concrete paving, manhole frames and covers shall be left 6" below finish grade. After street surfacing is completed, frames and covers shall be raised to grade per Std. Dwg. N9 S -105. l3 Sewer manhole frame and cover shall be Alhambra Foundry A -1270, or approved equal. Cover to be stomped 'SEWER'. 14. Sewer main shall be balled after ail manhole frames and covers have been raised to grade. 15. PVC. pipe may be used only with prior approval from the District Engineer. 16 Contractor shall be responsible for maintaining warning devices, flashing arrow boards, lights and flagmen in accordance with "WORK AREA TRAFFIC CONTROL HANDBOOK " published by Building News, Inc., 1985 I7 Trench backfill material shall be crushed aggregate base and shall be installed per CCM Std. 813. Bedding and french resurfacing shall be per CCM Std. 8 13. A permit shall be obtained from CCM prior to commencing work. /8. B4CKF /LL /N STREET R/W SHALL BE SLURRY PER CCM Std. 813. UTILITIES Mesa Consolidated Water 631 -1200 Pacific Telephone 633 -0811 Southern Calif. Edison 973 -5491 Southern Calif. Gas 634 -3117 Copley -Colony CATV 549 -3535 CALL Underground Service Alert 46 hrs. prior to excavating for underground locating. 1-800- 422- 4133 N -° THE CONSTRUCTION CHANNEL BETWEEN SEWER a SANTA ANA AVENUE AND BRISTOL STREET LOCATION MAP SCALE l` 600 MAFF /C CONrWIV NOTES: CONTRACTOR MAY CLOSE OAE LANEATA RAfF M -F !B 30 -3--30.) 11S/N6 FL4SH 1/Y6 APROW BOAPD e DEL /NEATORS. . OF V Plans comply with City of Costa Mesa standards for street reconstruction and are approved for issuance of Public Right -of -Way Excavation and Construction permit. ///3 i/ , BENCH MARK 31V - 50.70 /N THE 5'E PART OF THE /NT OF eR /6 7-04 ST. (PAL /SADES RP) AND SANTA ANA AVE., 1191 S.E. PA044 THE PR04aVO. OF THE SE. CURB OF THE AVE. TO 7?YC- 56AV,7.5 S.{y OF THE FACE cp_� CURB, 5.7 / S • OF' A =IRE HYDRANT, 0.5' S.E. OF THE pRol oN6'. OF THE S.E. 45n55 0F CGWC. ACO%'- WALL, SET /N TOP OF A CONC. POST, LEVEL W /7-f/ 7A1E WALI�. ELEVATION: 4C. 998 G'7-. - /976 A,9-J. NOTICE TO CON TRAC TORS: All contractors and subcontractors performing work shown on or related to these plans shall conduct their operations so that all persons are provided a safe place to work and the public is protected. All contractors and subcontractors shall comply with the State of California Department of Industrial Relations, Division of Industrial Safety and Health, "CONSTRUCTION SAFETY ORDERS. " The Dlsfrict Engineer shall not be responsible in any way for the contractor s and subcontractor s compliance with these orders. Contractor further agrees that he shall assume sole and complete responsibility for job site conditions during the course of constructan of this project, including safety of all persons and property; that this requirement shall apply continuously and not be limited to normal working hours; and that the contractor shall defend, indemnify, and hold the Costa Mesa Sanitary District and the District Engineer harm less from any and all liability, real or alleged, in connection with the performance of work on this projecf, excepting for liability arising from the sole negligence of the Costa Mesa Sanitary District, or the District Engineer. The existence, approximate location and extent of any underground utilities or structures shown hereon have been obtained by a search of the available records. The contractor is required to take due precautionary measures to protect the utility lines shown and any other lines not of record or not shown. if the contractor, while performing the contract, discovers utility facilities nor shown hereon, he shall immediately notify the District Engineer in writing. 91 Mo RCEJI72D M Up. IZ'71/$t Of it ENGINEER: COSTA MESA SANITARY DIST. Approved: .. 0 W s Ro in B. Homers R.C.E. 31720 Dote Q "AS BUILT-PHASE 1 to JAW 1990 Project NO 1112100 -10 SANTA ANA DELHI SHEET CHANNEL SEWER FROM SANTA ANA AVENUE of TO BRISTOL STREET 3 NUNP (1RT „d IANTA AN, 1 c COUNTM AND 68LF CLUD PL. F581ELT `11TE AA P nn. AVENU, MMAI I L DA. i DR. r Ic s LOCATION MAP SCALE l` 600 MAFF /C CONrWIV NOTES: CONTRACTOR MAY CLOSE OAE LANEATA RAfF M -F !B 30 -3--30.) 11S/N6 FL4SH 1/Y6 APROW BOAPD e DEL /NEATORS. . OF V Plans comply with City of Costa Mesa standards for street reconstruction and are approved for issuance of Public Right -of -Way Excavation and Construction permit. ///3 i/ , BENCH MARK 31V - 50.70 /N THE 5'E PART OF THE /NT OF eR /6 7-04 ST. (PAL /SADES RP) AND SANTA ANA AVE., 1191 S.E. PA044 THE PR04aVO. OF THE SE. CURB OF THE AVE. TO 7?YC- 56AV,7.5 S.{y OF THE FACE cp_� CURB, 5.7 / S • OF' A =IRE HYDRANT, 0.5' S.E. OF THE pRol oN6'. OF THE S.E. 45n55 0F CGWC. ACO%'- WALL, SET /N TOP OF A CONC. POST, LEVEL W /7-f/ 7A1E WALI�. ELEVATION: 4C. 998 G'7-. - /976 A,9-J. NOTICE TO CON TRAC TORS: All contractors and subcontractors performing work shown on or related to these plans shall conduct their operations so that all persons are provided a safe place to work and the public is protected. All contractors and subcontractors shall comply with the State of California Department of Industrial Relations, Division of Industrial Safety and Health, "CONSTRUCTION SAFETY ORDERS. " The Dlsfrict Engineer shall not be responsible in any way for the contractor s and subcontractor s compliance with these orders. Contractor further agrees that he shall assume sole and complete responsibility for job site conditions during the course of constructan of this project, including safety of all persons and property; that this requirement shall apply continuously and not be limited to normal working hours; and that the contractor shall defend, indemnify, and hold the Costa Mesa Sanitary District and the District Engineer harm less from any and all liability, real or alleged, in connection with the performance of work on this projecf, excepting for liability arising from the sole negligence of the Costa Mesa Sanitary District, or the District Engineer. The existence, approximate location and extent of any underground utilities or structures shown hereon have been obtained by a search of the available records. The contractor is required to take due precautionary measures to protect the utility lines shown and any other lines not of record or not shown. if the contractor, while performing the contract, discovers utility facilities nor shown hereon, he shall immediately notify the District Engineer in writing. 91 Mo RCEJI72D M Up. IZ'71/$t Of it ENGINEER: COSTA MESA SANITARY DIST. Approved: .. 0 W s Ro in B. Homers R.C.E. 31720 Dote Q "AS BUILT-PHASE 1 to JAW 1990 Project NO 1112100 -10 SANTA ANA DELHI SHEET CHANNEL SEWER FROM SANTA ANA AVENUE of TO BRISTOL STREET 3