Loading...
S-88-4.1i i . f_ EST /MATE OF OUANT/ T /ES Ns I ITEM UNIT OUANT. / Remodel exist. pump vault " L. S. L. S. 2 Const. new valve vault cos TA PL AN AND GENERAL NO TES. I. The sewer system shall conform to the standards of the Costa Mesa Sanitary District. 2. Contractor shall request inspection from the office of the District Engineer 48 hours prior to commencement of work. Tel. (714! 63/ -1731 3 Any work performed without inspection from the District shall be considered unacceptable. 4. Contractor shall obtain C M..S.D. sewer permit prior to construction from the Department of Streets and Sanitation, City of Costa Mesa, 77 Far Drive. Tel (714) 754-5323. 5 Contractor shall obtain all necessary permits that may be requirea by the local governing agency. 6 Contractor to have a• copy of approved sewer plan and CMS.D. Standard Plans and Specifications on job site of a// times. 7 Clay pipe joints shall be Type `G" mechanical compression joints for main line sewer Type "D" joints, Band -Seal or approved equal, are approved for loterals and repair work only. l0. Stanp "S "on curb at sewer lateral locations. / 1. Sewer main shall be air or water tested meeting District Engineers approval 12. Prior to asphalt concrete paving, manhole frames and covers shall be left 6" below finish grade. After street surfacing is completed, frames and covers shall be raised to, grade per Sid. Dwg. N° S -105. 13. Sewer manhole frame and cover shall be Alhambra Foundry A -1270, or approved equal. Cover to be stomped 'SEWER'. 14. Sewer main shall be balled after al/ manhole frames and covers have been raised to grade. EN gin@ 16 Contractor shall be responsible for maintaining warning devices, flashing arrow boards, lights and flogmen in accordance with "WORK AREA TRAFFIC' CONTROL HANG ±OJK " published by Building News, Inc., 1985 17 Trench backfill material shall be crushed aggregate base and shall be installed per CCM Std. 6/3. Bedding and french resurfacing shall be per CCM Std. 813. A permit shall be obtained from CCM prior to commencing work. Revisions UTIUT /ES % CALL N° Date Description Mesa Consolidated Water 631 -1200 Underground Service Alert 0 3/ae m GUILT ' Pacific Tglephone 633-0611 Southern Calif. Edison 973 -5491 error to excavating Southern Calif. Gas 634 -3117 for wWer9round locating. Copley - Colony CATV 549 -3535 1-800-422-4133 MESA SAN /TARP DISTRICT PRO✓EC T N° / 112 /00 —100 PROFILE FOR THE CONS TRUC T I ON OF CALIFORNIA THE CALIFORNIA PUMP STAT /ON IN NTERSECT/Ol1/.11 OF STREET AND ALASKA AVENUE 3 • S.w c o9 `"` � � tiC 1 �Ira V r^ o tt• LOCATION it p r f + / vOG q lot Ck � w S► � � ► � ti�� to , i p. `�� •t +.ai f .. n a ' c o c� ., l re aI i lip � �T \� LOCATION MAP SCALE /= 600' TRAFFIC CONTROL NOTES /. CONTRAC70R TO AfAlIVTA /N ACCESS M ALL RESIDENTIAL DRIVEAVAYS 67REEM AT ALL nmEs. 3 BENCH MARK= D.C.S. Benchmark /L -39 -75 In the SE'LY part of the inter. of E/ /is Ave. and Euclid St. , s/o the San Diego freeway and w/o the Santo Aho river. l.5 feet n/o a 7 foot high brick wall of the Son 11at/on District; about 200 feet w/o the drain link fence along the Santo Ana river; about 59.6 feet E'LY from the centerline of the medlon of Euclid St. prolonged S'LY to the brick wall; set in the top of a conc. post 4 " above ground. ELEV. = 27.050 0976 ADJ.) NOTICE TO CON TRAC TORS All contractors and subcontractors performing work shown on or related to these plans shall conduct their operations so that all persons are provided a safe place to work and the public is protected. All contractors and subcontractors shall comply with me State of California Department of Industrial Relations, Division of Industrial Safety and Health, "CONSTRUCTION SAFETY ORDERS." The District Engineer shall not be responsible in any way for the contractors and subcontracts s compliance with these orders. Contractor further agrees that he shall assume sole and complete responsibility for job site conditions during the course of construchbo of this project, including safety of all persons and property; that this requirement shall apply continuously and not be limited to normal working hours; and that the contractor shall defend, indemnify, and hold the Costa Mesa Sanitary District and the District Engineer harmless from any and all liability, real or alleged, in connection with the performance of work on this project. excepting for liability arising from the sole negligence of the Costa Mesa Sanitary District, or the District Engineer. The existence, approximate location and extent of any underground - utilities or structures shown hereon have been obtained by a search of the available records. The contractor is required to take due precautionary measures to protect the utility lines shown and any other lines not of record or not shown. h` the contractor, while performing the contract, discovers utility facilities not shown hereon, he shall immediately notify the District Engineer in writing. t► . i / aul rm / OF cx>� Project Ns lll2 /00 - /00 Plans comply with C/ty of Costa Mesa standards for ENGINEER: SHEET street reconstruction and are approved for issuance CALIFORNIA STREET of Public Right -of -Way Excavotlon and Construction COSTA MESA SANITARY DIST. permit. Approved PUMPING STATION of AS 4 �o � a� CONVERSION 5 Bruce D. atfern it i eer H.C.E. 1938 'Doge Robin B. Homers R.C.E. 31720 Dote g� g r i BENCH MARK= D.C.S. Benchmark /L -39 -75 In the SE'LY part of the inter. of E/ /is Ave. and Euclid St. , s/o the San Diego freeway and w/o the Santo Aho river. l.5 feet n/o a 7 foot high brick wall of the Son 11at/on District; about 200 feet w/o the drain link fence along the Santo Ana river; about 59.6 feet E'LY from the centerline of the medlon of Euclid St. prolonged S'LY to the brick wall; set in the top of a conc. post 4 " above ground. ELEV. = 27.050 0976 ADJ.) NOTICE TO CON TRAC TORS All contractors and subcontractors performing work shown on or related to these plans shall conduct their operations so that all persons are provided a safe place to work and the public is protected. All contractors and subcontractors shall comply with me State of California Department of Industrial Relations, Division of Industrial Safety and Health, "CONSTRUCTION SAFETY ORDERS." The District Engineer shall not be responsible in any way for the contractors and subcontracts s compliance with these orders. Contractor further agrees that he shall assume sole and complete responsibility for job site conditions during the course of construchbo of this project, including safety of all persons and property; that this requirement shall apply continuously and not be limited to normal working hours; and that the contractor shall defend, indemnify, and hold the Costa Mesa Sanitary District and the District Engineer harmless from any and all liability, real or alleged, in connection with the performance of work on this project. excepting for liability arising from the sole negligence of the Costa Mesa Sanitary District, or the District Engineer. The existence, approximate location and extent of any underground - utilities or structures shown hereon have been obtained by a search of the available records. The contractor is required to take due precautionary measures to protect the utility lines shown and any other lines not of record or not shown. h` the contractor, while performing the contract, discovers utility facilities not shown hereon, he shall immediately notify the District Engineer in writing. t► . i / aul rm / OF cx>� Project Ns lll2 /00 - /00 Plans comply with C/ty of Costa Mesa standards for ENGINEER: SHEET street reconstruction and are approved for issuance CALIFORNIA STREET of Public Right -of -Way Excavotlon and Construction COSTA MESA SANITARY DIST. permit. Approved PUMPING STATION of AS 4 �o � a� CONVERSION 5 Bruce D. atfern it i eer H.C.E. 1938 'Doge Robin B. Homers R.C.E. 31720 Dote g� g r