Loading...
S-86-5.10 EST /MA TE OF OUANT / 7"/ ES iGENERAL NO TES 1. The sewer system shall conform to the standards of the Costa COSTA. MESA SANITARY DISTRICT PROJECT N° / 112 100 — 94 PROF / L E FOR THE REHABILITATION OF PL AN AND MANHOLES IN Cl T Y ----OF -COSTA MESA A 0 i , +' .s �, � Y � yam. � t• � y 4�,' r � ,� r • � `ore a ,? � �� � ., Jd •O �s •• f�, ;,• "� s t . c t 1+11,-4 �v( 7 t c.. < ..c �� . 0..tw!:l rU. F ' •0� 'p T $ M � ,.� �Y • 3 : Y a •.w RJ • • i .o.s. . u..0 � ' tau. '�s, Al TA AMA _ V AVE • t SEE WEET Z VM DETAILED LUDOW LOCATION MAP - -- ND hLALE — -- - • ^r. • ti r " a NOTICE TO -CON TRAC TORS All contractors and subcontractors performing wont shown on or related to these plans shall conduct their cperafions so that all persons are provided a safe place to work and the public is protected. All contractors and subcontractors shall comply with We State of California Department of Industrial Relations, Division of Industrial Safety and Health, "CONSTRUCTION SAFETY ORDERS," The District Engineer shall not be r-espeansib /e in any way for the contractor's and subcontractor's compliance with these orders. _ Contractor further agrees that he shall assume sole ond,. complete responsibility for job site conditions during the course of constructxn of this project, including safety of all persons and property; that this requirement shall apply continuously and not be limited to normal working hours; and that the contractor shall defend, indemnify, and hold the Costa Mesa Sanitary District and the District Engineer harm less from'any and all liability, real or alleged, in connection with the performance of work on this project, excepting for liability arising from the sole negligence of the Costa Mesa Sanitary District, or the District Engineer. The exisfence, approximate location and extent of any underground utilities or structures shown hereon have been obtained by a search of the available records. The contractor is required to take due precautionary measures to protect the utility lines shown and any other lines not of record or not shown. If the contractor, while performing the contract, discovers utility facilities not shown hereon, he shall immediate ly notify the District Engineer in writing. TRAFF /C CONTROL NOTES:. - Contractor to abide by C/ty of Costa Mesa requirements for working hears �9��0 and traffic contra /. Contractor Is required to submit traffic contra/ plans to kA. City prior to obtaining permit. mod°, W3. Contractor Is required to use flash arrow board for any /one closure on arteria ls. "M1720 Contractor may close / lone on arteria ls between 8:30 A.M. - 3:30 P.M. and c►v.� maintain two way traffic on other streets. Plans comply with City of Costa Mesa standards for ENGINEER: street reconstruction and aid approved for issuance COSTA MESA SAN /TARY D /ST. of Public Right - of - Woy Excavation and Construction permit. / Approved ✓ Bruce D. Wtern C#Y E /near R.C.E°1 88' Dofe Robin 9 Homers R.C.E. 31720 Date k SAS BUILT Project NO 1112100 -94 REHABILITATION hHEET i OF n� MANHOLES ' g� Y Mesa Son /tar, District. 2 Contractor shall request inspection fran the office of the District Engineer 46 hours prior 10 commencement of work. Tel (714 &N - /7S.. 3 Any work performed without inspection from the District shall be considered unacceptable. 4 Contractor shall obtain C.M.SD. sewer permit prior to construction from the Department of Streets and Sanitation, City of Costa Mesa, 77 Far Drive. Tel (714) 754 -5323. 5 Contractor shall obtain all necessary permits that may be required by the local governing agency. 6. Contractor to have a• copy of approved sewer plan and CAMD, Standard Pons and Specifications on job site at a// times. 7 Cloy pipe joints shall be Type "G" mechanical compression joints for main line sewer. Type "D" joints, Bond -Seal or approve, equal, are approved for laterals and repair work only. 8. 6." laterals shall be constructed from the sewer main to every lot. 9 Al/ laterals shall be placed prior to surfacing of streets. /0° Sionp "S "on curb at sewer lateral locations. 1 /. Sewer main shall be air or water tested meeting District Engineers approval 12. Prior to asphalt concrete paving, manhole frames and covers shall be left 6" below finish grade. After street surfacing is completed., frames and covers shall be raised to grade per Std. Dwg. N° S -105. 13. Sewer manhole frame and cover shall be A/hombro Foundry A -1270, or approved equal. Cover to be stomped 'SEWER'. 14 Sewer main shall be balled after al/ manhole frames and covers have been raised to grade. I - 15. PVC pipe moy be used only with prior approval from the District Engineer. 16. Contractor shall be responsible for maintaining warning devices, flashing arrow boards, lights and flagmen in accordance with "WORK AREA TRAFFIC' CONTROL HANDBOOK It published by Building News, Inc.; 1965 17 Trench backfill material shall be class - 100E sand cement slurry and shall be tnstolled per CCU Std. 613. Bedding and french resurfacing shall be per CCU Std. 813 A permit shall be obtained from CCM prior to commencing work. Revisions ' Tl/ ILIT /ES CALL N° Date Description Underground Service Alert 48 hrs. prior to ercavafing for underground locating. 1-800-422-4133 MANHOLES IN Cl T Y ----OF -COSTA MESA A 0 i , +' .s �, � Y � yam. � t• � y 4�,' r � ,� r • � `ore a ,? � �� � ., Jd •O �s •• f�, ;,• "� s t . c t 1+11,-4 �v( 7 t c.. < ..c �� . 0..tw!:l rU. F ' •0� 'p T $ M � ,.� �Y • 3 : Y a •.w RJ • • i .o.s. . u..0 � ' tau. '�s, Al TA AMA _ V AVE • t SEE WEET Z VM DETAILED LUDOW LOCATION MAP - -- ND hLALE — -- - • ^r. • ti r " a NOTICE TO -CON TRAC TORS All contractors and subcontractors performing wont shown on or related to these plans shall conduct their cperafions so that all persons are provided a safe place to work and the public is protected. All contractors and subcontractors shall comply with We State of California Department of Industrial Relations, Division of Industrial Safety and Health, "CONSTRUCTION SAFETY ORDERS," The District Engineer shall not be r-espeansib /e in any way for the contractor's and subcontractor's compliance with these orders. _ Contractor further agrees that he shall assume sole ond,. complete responsibility for job site conditions during the course of constructxn of this project, including safety of all persons and property; that this requirement shall apply continuously and not be limited to normal working hours; and that the contractor shall defend, indemnify, and hold the Costa Mesa Sanitary District and the District Engineer harm less from'any and all liability, real or alleged, in connection with the performance of work on this project, excepting for liability arising from the sole negligence of the Costa Mesa Sanitary District, or the District Engineer. The exisfence, approximate location and extent of any underground utilities or structures shown hereon have been obtained by a search of the available records. The contractor is required to take due precautionary measures to protect the utility lines shown and any other lines not of record or not shown. If the contractor, while performing the contract, discovers utility facilities not shown hereon, he shall immediate ly notify the District Engineer in writing. TRAFF /C CONTROL NOTES:. - Contractor to abide by C/ty of Costa Mesa requirements for working hears �9��0 and traffic contra /. Contractor Is required to submit traffic contra/ plans to kA. City prior to obtaining permit. mod°, W3. Contractor Is required to use flash arrow board for any /one closure on arteria ls. "M1720 Contractor may close / lone on arteria ls between 8:30 A.M. - 3:30 P.M. and c►v.� maintain two way traffic on other streets. Plans comply with City of Costa Mesa standards for ENGINEER: street reconstruction and aid approved for issuance COSTA MESA SAN /TARY D /ST. of Public Right - of - Woy Excavation and Construction permit. / Approved ✓ Bruce D. Wtern C#Y E /near R.C.E°1 88' Dofe Robin 9 Homers R.C.E. 31720 Date k SAS BUILT Project NO 1112100 -94 REHABILITATION hHEET i OF n� MANHOLES ' g� Y