S-2008-1.1t
Z
T
� T
c
2
r00
�o
r O
J N
i
wim
S0ANITq
SI
IRVINE AVENUE
w At 11"
an 1: 3: 1 L
kvivi : a an a kv, VA MAI I L
APPROVED :
PREPARED BY :
No.
i /4407e
EW 3/31/06
SEPTEMBER
PROJECT NO. 168
2004
PHASE
ROBIN B. HAMERS R.C.E. 31720
MANAGER /DISTRICT ENGINEER
JOSEPH L. HOYLE R.C.E. 44497
PROJECT MANAGER
Down Bom ENttiMumme
Consulting Engineers
23231 South Pointe Drive, Suite 103
Laguna Hills, CA 92653 p49) 76&2600
DATE:
DATE:
i�i7�flb
1 T ,q
RECORD DRAWING
THIS IS A RECORD DRAWING OF THE FACILITIES IDENTIFIED
IN THE TITLE BLOCK ONLY AND HAS BEEN PREPARED IN PART
ON THE BASIS OF INFORMATION COMPILED AND FURNISHED BY
OTHERS. THE ENGINEER AND OWNERS(S) WILL NOT BE
RESPONSIBLE FOR ANY ERROR(S) OR OMISSION(S) WHICH
HAVE BEEN INCORPORATED INTO THIS DRAWING. ACTUAL
CONDITIONS WILL VARY SOMEWHAT FROM THE MNDTTIONS
SHOWN HEREIN AND AT SOME LOCATIONS THE VARIANCE MAY
BE LARGE. IF THE PRECISE LOCATION OF ANY FACILITY IS
REQUIRED, THE FACILITY SHOULD BE FIELD LOCATED IN THE
PRESENCE OF AN EMPLOYEE OF THE CITY / DWMCT OR THE
OWNER(S) OF THE UTILITIES INVOLVED.
H: \NO3 \110 \p1ans \dwg \RECORD DRAWINGS \CVRCM1.dwg 01/17/06 9:16om PLOT AT 1 =1 D -537