Loading...
S-2008-1.1t Z T � T c 2 r00 �o r O J N i wim S0ANITq SI IRVINE AVENUE w At 11" an 1: 3: 1 L kvivi : a an a kv, VA MAI I L APPROVED : PREPARED BY : No. i /4407e EW 3/31/06 SEPTEMBER PROJECT NO. 168 2004 PHASE ROBIN B. HAMERS R.C.E. 31720 MANAGER /DISTRICT ENGINEER JOSEPH L. HOYLE R.C.E. 44497 PROJECT MANAGER Down Bom ENttiMumme Consulting Engineers 23231 South Pointe Drive, Suite 103 Laguna Hills, CA 92653 p49) 76&2600 DATE: DATE: i�i7�flb 1 T ,q RECORD DRAWING THIS IS A RECORD DRAWING OF THE FACILITIES IDENTIFIED IN THE TITLE BLOCK ONLY AND HAS BEEN PREPARED IN PART ON THE BASIS OF INFORMATION COMPILED AND FURNISHED BY OTHERS. THE ENGINEER AND OWNERS(S) WILL NOT BE RESPONSIBLE FOR ANY ERROR(S) OR OMISSION(S) WHICH HAVE BEEN INCORPORATED INTO THIS DRAWING. ACTUAL CONDITIONS WILL VARY SOMEWHAT FROM THE MNDTTIONS SHOWN HEREIN AND AT SOME LOCATIONS THE VARIANCE MAY BE LARGE. IF THE PRECISE LOCATION OF ANY FACILITY IS REQUIRED, THE FACILITY SHOULD BE FIELD LOCATED IN THE PRESENCE OF AN EMPLOYEE OF THE CITY / DWMCT OR THE OWNER(S) OF THE UTILITIES INVOLVED. H: \NO3 \110 \p1ans \dwg \RECORD DRAWINGS \CVRCM1.dwg 01/17/06 9:16om PLOT AT 1 =1 D -537