Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
S-2005-2.11
Z s J W N 0 0 N f v i a ag A V< MIT CRUSH ROCK PIPE SUBGRADE PIPE FOUNDATION 1 W =MAX ALLOWABLE TRENCH WIDTH O.B. +16" MAX O.B. +12" MIN V.C.P. — TYPE II SLOPE AND EXTEND OF SHORING AS DETERMINED BY CONTRACTOR 12" TYP CN NOTE: SEE CITY OF COSTA MESA STD. DWG. 813 FOR TRENCH RESURFACING DETAILS (IN SPECS). NG AS DETERMINED )NTRACTOR TYP UNDISTURBED SOIL- �.�a nay PIPE SUBGRADE PIPE FOUNDATION 3/4" MAX. CRUSHED ROCK NOTE: — FOR VCP OVERWIDTH CONDITION USE TYPE IV BEDDING FOR 33 V VCP V.C.P. TYPE IV ON COLLEGE AVE. FROM STA 1 +90 TO STA 7 +50. USE TYPE II BEDDING FOR OVERWIDTH CONDITION AT ALL OTHER LOCATIONS. BEDDING DETAILS NOT TO SCALE FULL DEPTH AC =EXIST AC +AB +1" (MIN. AC PAVEMENT 6" OR 1" GREATER THAN EXISTING, WHICHEVER IS GREATER.) z in REMOVE AND DISPOSE OF EXISTING MANHOLE FILL WITH IMPORTED SAND MIN. SE 70 BREAK HOLE IN MANHOLE BASE MANHOLE ABANDONMENTr 3 NOT TO SCALE INV. ELEV. 25� " E 12 30" N 28.80 6" E ''I I I II I I II I II I Idl INSTALLED 20" HOPE 25' EASEMENT RECHANNEL MH BASE TO DIRECT FLOW TO SOUTH INV. ELEV 26.05 21 E —W 27.62 6" N INSTALLED NEW 60" MH NOTE EXISTING BUILDING AND CULTURE IN VICINITY NOT SHOWN VERIFY IN FI ELD. I� wl zl ¢I o: J (n C7 w O ci 555 65' !� I i HARBOR PIPING PLAN SCALE 1" = 40' CONSTRUCTION NOTES: O Protect in place. HOPE O Rehabilitate the existing 30 VCP sewer by installing a 20 —inch eeFRPM liner pipe inside the 30" VCP at constant slope of 0.0021 between the elevations shown and grouting the remaining annular space. Since the invert of the existing VCP may not slope constantly throughout the reach, the following procedure may be followed. 1. Bypass flow to the adjacent 18" VCP, if necessary. 2. Clean the existing 30" VCP. 3• Place a layer of grout at the pipe invert to provide a level surface. A flowable grout is required to cover the complete reach. HDPE 4, Install the 20 —inch ^^tier PM liner pipe in the existing 30" VCP using casing spacers of variable height along the length of the rehabilitated sewer to provide the shown slope. The existing manhole on the east side of Harbor Blvd. shall be removed entirely and disposed of and the 20 —inch pipe inserted from a pit constructed at this location. Upon completion of the insertion a new 48 —inch manhole shall be constructed in accordance with CMSD Standard Drawing S -100. HDPE 5, The 20 —inch eeFRPM liner pipe shall be inserted through the manhole in the center of Harbor Blvd. HDPE 6, After insertion of the 20 —inch GGFRPM liner pipe the remaining annular space between the 20 —inch pipe and the 30 —inch pipe shall be filled with grout. 45' 55' a a o INV. ELEV 26.11 21" E —W 27.72 18" S 7 SEE SHEET 12 y BURGER KING 1 INV. ELEV s 26.30 21 " E —W 27.06 8" S Q 27.32 6" W ABANDON SEE SHEET 12 2 CONSTRUCTION NOTES: CONTINUED 30 Remove and dispose of existing manhole and construct new 60" winch manhole per CMSD Standard Drawing S -100. Line manhole with polyurethane, Sancon 200 or equal. ® Upon completion of the pipe insertion remodel the concrete manhole base to provide smooth channels and inverts between the inlet and outlet pipes. O Plug existing 18" VCP with concrete. © Plug existing 30" VCP with concrete. 70 Abandon existing 18" VCP in place per specs. ® Rehabilitate existing manhole. See specs. ORANGE COUNTY SANITATION DISTRICT soWLE Affwv a mina rion BEDDING DETAILS AND HARBOR PIPING PLAN RECORD �R.4 L�l/ /NG RECORD DRAWING KK QDN 2/05 p+n OCT. 2002 THESE RECORD DRAWINGS HAVE BEEN PREPARED BASED 1 CONFORMED PER ADDENDUM No. 1 PES 0/03 Dcmm PES rRaECT �,,,,,,�„ IN PART ON INFORMATION PROVIDED BY CONTRACTORS AND OCSO INSPECTORS NO. DESCRIPTION APPROVED DATE wmm REVISIONS CHEacm PROD= ENOMM RC.E. IML DUE DUE DROW No. SHM 17 7