Loading...
S-85-1.1t �s - • i G. EST /MATE OF OUANTI T /ES AP I I TEM M OUANT. . r L.S. j — t L.S. EST /MATE OF OUANTI T /ES AP I I TEM M OUANT. / I REMODEL PUMP STA77ON L.S. — 2.1 CONSTRUCT BY -PASS CONNECTION L.S. COAT WET HELL INTERIOR S. F. 565 t .COSTA MESA SANITA,RY, PROJECT /J? 1112100-75 DISTRICT PLAN AND PROF / L E FOR THE CONSTRUCTION ADAMS A VE/Y(JE PUMP STATION GENERAL NO TES I. The sewer system shall conform to the standards of the Costa Mesa Sanitary District. 2 Contractor shall request inspection from the office of the District Engineer 48 hours prior to commencement of work. Tel (714) 6N -1731 3. Any work performed without inspection from the District shall be considered unacceptable. 4 Contractor shall obtain C.M.S.D. sewer permit prior to construction from the Department of Streets and Sanitation, City of Costa Mesa, 77 Fdr Drive. Tel (714) 754 -5323. 5 Contractor shall obtain right -of -way permits prior to start of any construction and request kupectnon from CCM Eng. Div. 48 hrs. prior to start of any work , tel. 074) 754 -5323. 6 Contractor to have a- copy of approved sewer plan and CMS.D. Stantard Plans and Specifications on job site of all times. 7 Clay pipe joints shall be Type "G" mechanical compression joints for main line sewer. Type "D" joints, Band -Seal or approved equal, are approved for laterals and repair work only. B. 6" laterals shall be constructed from the sewer main to every lot. 9 All laterals shall be placed prior to surfacing of- stresls and backfil/ed per CCM 41d. BOI. /0. Starrw "S" on orb at sewer lateral locations. 1I Sewer main shall be air or water tested meeting District Engineers approval 12. Prior to asphalt concrete paving, manhole frames and covers shall be left 6" below finish grade. After street surfacing is completed per CCM Std. ODI frames and covers shall be raised to grade per Std Dwg. Ns S -105. /5 Sewer manhole frame and cover shall be Alhambra Foundry A -1270, or approved equal. Cover to be stamped `SEWER'. 14 Sewer main shall be balled after al/ manhole frames and covers have been raised to grade. 15 PVC pipe mqy be used only with prior approval from the District - -__ Engineer. 16 Contractor shall be responsible for furnishing and maintaining warning devices, arrow board, lights and flagmen in accordance with "WORK AREA TRAFFIC' CONTROL HANDBOOK " published by Building News, Inc., 1982. 17 All PCC and AC to be joined sho/lbe sorry in a clean .and straight Brie and os directed by the City of Costa Mesa. 18. All work within the Public right -al- way shall conform to the City of Costa Mesa standards and tbol/ meet the gpprorryal of the City Engineer. c� UTILITIES: CALL Ns Date MESA CONSOLIDATED 0xi rgrai nd Service A/ert WATER DISTRICT (7/4J63/- /200 PACIFIC TELEPHONE " 633 -08 11 *s. g� b errcovoting for underground locating. SO. CAL. EDISON " 973-5491 - SO. CAL. GAS 'v 634 -3117 800-422-4133 a IN ADAMS AVENUE 600 E'L Y OF THE SANTA ANA RIVER LOCATION MAP SCALE /"z/000 a n BENCH MARK= D C.S. Benchmark H88-244-77 On the north side of Adams Avenue, 1.1 miles west of Harbor 4 Boulevard, or 0.4 miles east of the east side of the Adams Avenue Bridge over the Santa Ana River - 82.7 feet west _of the east end of a 6foot chain link fence paralleling Adams Avenue t 1.4 feet south of fence f 7.5 feet back of curb: 50 feet north of the center of Adams Avenue f 0.2 feet above ground and about 0.2 feet lower than the concrete fence foundation. Set in the top of a concrete post. 1976 ELEV. = 3/.956 NOTICE TO CON TRAC TORS ;All contractors and subcontractors performing work shown on or related to these plans shall conduct their operations so that all persons are provided a safe place to work and the public is protected. All contractors and subcontractors shall comply with Ahe State of California Department of Industrial Relations, Division of Industrial Safety and Health, "CONSTRUCT /ON SAFETY ORDERS.' The District Engineer shall not be responsible -� in any way for the contractors and subcontractor a compliance with these orders. Contractor further ogees that he shall assume sole and complete responsibility for .job site conditions during the course of construction of this project, including safety of o// persons and property; that this requirement shall apply continuously and not be limited so normal working hours; and that the contractor shall defend, 0demnify, and hold the Costa Mesa Sanitary District and the District Engineer harm less from any and a// liability, real or alleged, in connection with the performance of work on this project accepting for liability arising from the. sole negligence of the Costa Mesa Sanitary District, or the District Engineer. The existence, approximate location and extent of any underground utilities or structures shown hereon have been obtained by a search of the available records. The contractor is required to take due precautionary measures to protect the u0ty lines shown and arty other lines not of record or not shown. K the contractor, while performing the contract, discovers utility facilities not shown hereon, be shall immediately notify the District Engineer in writing. ®" AS BUILT" 1123185, Project N! 1112100 -75 Plans comply with City of Costa Mesa stanabrd; for street reconstruction and are approved for issuance E/VGINEER: SHEET of Public Right -of-Wt Exoavo * and Covsstraction COSTA MESA SANITARY D/ST. ADAMS AVE. PUMP STATION PlPrmit. Approved: OF REMODEL Bruce O. Mottein City Engineer R.C.E. 19388 Dote Robin B. Ham ers R.C.E. l 720 Date " 4 y n BENCH MARK= D C.S. Benchmark H88-244-77 On the north side of Adams Avenue, 1.1 miles west of Harbor 4 Boulevard, or 0.4 miles east of the east side of the Adams Avenue Bridge over the Santa Ana River - 82.7 feet west _of the east end of a 6foot chain link fence paralleling Adams Avenue t 1.4 feet south of fence f 7.5 feet back of curb: 50 feet north of the center of Adams Avenue f 0.2 feet above ground and about 0.2 feet lower than the concrete fence foundation. Set in the top of a concrete post. 1976 ELEV. = 3/.956 NOTICE TO CON TRAC TORS ;All contractors and subcontractors performing work shown on or related to these plans shall conduct their operations so that all persons are provided a safe place to work and the public is protected. All contractors and subcontractors shall comply with Ahe State of California Department of Industrial Relations, Division of Industrial Safety and Health, "CONSTRUCT /ON SAFETY ORDERS.' The District Engineer shall not be responsible -� in any way for the contractors and subcontractor a compliance with these orders. Contractor further ogees that he shall assume sole and complete responsibility for .job site conditions during the course of construction of this project, including safety of o// persons and property; that this requirement shall apply continuously and not be limited so normal working hours; and that the contractor shall defend, 0demnify, and hold the Costa Mesa Sanitary District and the District Engineer harm less from any and a// liability, real or alleged, in connection with the performance of work on this project accepting for liability arising from the. sole negligence of the Costa Mesa Sanitary District, or the District Engineer. The existence, approximate location and extent of any underground utilities or structures shown hereon have been obtained by a search of the available records. The contractor is required to take due precautionary measures to protect the u0ty lines shown and arty other lines not of record or not shown. K the contractor, while performing the contract, discovers utility facilities not shown hereon, be shall immediately notify the District Engineer in writing. ®" AS BUILT" 1123185, Project N! 1112100 -75 Plans comply with City of Costa Mesa stanabrd; for street reconstruction and are approved for issuance E/VGINEER: SHEET of Public Right -of-Wt Exoavo * and Covsstraction COSTA MESA SANITARY D/ST. ADAMS AVE. PUMP STATION PlPrmit. Approved: OF REMODEL Bruce O. Mottein City Engineer R.C.E. 19388 Dote Robin B. Ham ers R.C.E. l 720 Date "